Loading...
ST8402-CS 880729GINN, INC. CONSULTING ENGINEERS July 29, 1988 Mr. Jay Chester ABQ Development Corporation 625 Silver SW, Suite 200 P.O. Box 25625 Albuquerque, NM 87125 Re: Parkway Boulevard Coppell, Texas Dear Mr. Chester: The purpose of this letter is to respond to your letter of July 18, 1988 and to document a meeting held July 25, 1988 in Coppell, Texas. The conceptual plan of the proposed Parkway Boulevard as presented by Jerry Parche is acceptable to the City of Coppell. It is our understanding that you will plat the R.O.W. for Parkway Boulevard, the street to serve the new high school, and the 3 or 4 feet of R.O.W. along Denton Tap. This will clear up discrepancies between the Dallas County R.O.W. records and ABQ records. This should all be on one plat with references to the boundaries of the entire ABQ tract. The proposed alignment of Parkway Boulevard is much more desirable than having a tee-intersection as was shown on the park submittal. At the time of final plat submittal and review, we will recommend to Planning and Zoning and the City Council that ABQ Development be allowed to use the 3 or 4 feet dedicated for R.O.W. as the point of reference for future setbacks and that the amount of R.O.W. dedicated (est. approx. 5,000 sf) be used in the gross acreage for compiling project densities. Please let us know if we can be of any further assistance. H. Wayne Ginh, P.E. HWG/dsp cc: Alan D. Ratliff Russell Doyle Jerry Parche Dr. Stanfield, CISD Steve Goram File 379, 88241 17103 Preston Road · Suite 100 · LBiI8 · Dallas. Texas 75248 · Phone 214/248-4900