ST8402-CS 870202GINN, INC.
February 2, 1987
CONSULTING ENGINEERS
City of Coppell
P.O. Box 478
Coppell, TX 75019
Attn: Steve Morton
Re:
Final Acceptance
Sandy Lake/Denton Tap Intersection
Dear Mr. Morton:
Final acceptance to the above referenced project has been
recognized, upon receipt of the one-year maintenance bonds and
final waiver of lien, dated December 18, 1986. Enclosed are
copies of the bonds and waiver of lien with a maturity date of
December 18, 1987.
Sincerely, J
Randy Fleming
Chief Inspector
/SS
Enclosures
cc: Kevin Peiffer
17103 Preston Road ® Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900