Loading...
ST8402-CS 870202GINN, INC. February 2, 1987 CONSULTING ENGINEERS City of Coppell P.O. Box 478 Coppell, TX 75019 Attn: Steve Morton Re: Final Acceptance Sandy Lake/Denton Tap Intersection Dear Mr. Morton: Final acceptance to the above referenced project has been recognized, upon receipt of the one-year maintenance bonds and final waiver of lien, dated December 18, 1986. Enclosed are copies of the bonds and waiver of lien with a maturity date of December 18, 1987. Sincerely, J Randy Fleming Chief Inspector /SS Enclosures cc: Kevin Peiffer 17103 Preston Road ® Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900