Loading...
WA9601-LR 980910HENLEY JOHNSTON & ASSOCIATES, INC. Transmittal Date: ] 0 September ] 998 To: Shimek, Jacobs & Finklea, L.L.P. Attn: Mr. Gary C. Hendricks, P.E. Project: Wagon Wheel Ranch Elevated Storaqe Tank Gentlemen: Henley-Johnston & Assoc., Inc. transmits herewith Daily F~]~ ~p~r~ and ~lmTn~ry~F C~ncre~ S~r~ng~hTaq~,q the following: Comments: Report Nos. 039 thru 044, inclusive cc: l~rry Davis, City of Coppell Joe Swinnea, I andmark Sincerely yours, Henley-Johnston & Assoc., Inc. 7~~--Z~~ Project No. 6878 Herbert C. Crowder {tiephone [2141 941-3808 J'n.~ (2141 943.7645 235 Morgan Aue.. Daltas. Texas 75203,1088 HENfc. EY JOHNSTON & ASSOCIATES, INC. engineering geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: WEATHER: C~, 97',~ TIME: START WORK: D E LAYS: Z~'-~'s,~,,~,, b~ ~-~ DAILY FIELD REPORT HJA JOB No: 6878 TECHNICIAN: REVIEWED BY: / STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: 'CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ) 1. PIER INSPECTION / FOUNDATION ( ) 10. L,~2. CONCRETE INSPECTION ( ) 3. SUB-SURFACEDRAIN INSTALLATION ( ) 12. ) 4. SELECT FILL PLACEMENT ( ) 13. ) 5. LIME STABILIZATION ( I-'//' 14. ) 6. FOOTING INSPECTION ( ) 15. ) 7. GENERAL INSPECTION * ( ) 16. ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. ) 9. TIE-BACK INSPECTION ( ) 18. FIELD DENSITY TESTING CONCRETE CYLINDER / PICK-UP GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS ENGINEER: REPORT No.: O --~ 9 SHEET // OF Z, telephone (214) 941-3808 ~ax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 !iIENLEy JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No, TICKET No, TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION '711 I I Z~f 7 3'7 IZ SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: ~/~/,,Y"'? 8 SUPPLIER TXI SET 2 l/T4 CYL. No. MIX / SLUM P DATE DATE (in) PLACED TESTED TOTAL COMPR. AGE LOAD STRENGTH (days) (Ibs.) (psi) '~ / ~"b//fP"'D .q 7H-D MIX DESIGN SET1 SET2 CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.) (Ibs.) (Ibs.) (9als/sk) TECHNICIAN ENGINEER REPORT No. REQ'D REQ'D 7 DAY 28 DAY (psi) (psi) ADMIX SHEET 2 OF Z telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants DALLY FIELD REPORT PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. REPORT DATE: ,/'~"-/"9'~ HJA JOB No: 6878 TECHNICIAN: REVIEWED BY: / , //,.,k;-..{ I/.,:..r2,~, u:,:,.L'.~ ,,~,j. WEATHER: ~/ -:', ,/ .... TIME: START WORK: ,' '%P/:'.~i' STOP WORK: 5": ~'a/'~A,f DELAYS: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( )~. ( ( )3. ( )4. ( )s. ( )6. ( )7. ( ( )9. PIER INSPECTION / FOUNDATION CONCRETE INSPECTION SUB-SURFACE DRAIN INSTALLATION SELECT FILL PLACEMENT LIME STABILIZATION FOOTING INSPECTION GENERAL INSPECTION * REINFORCEMENT STEEL INSPECTION TIE-BACK INSPECTION REMARKS: ( ) 10. FIELD DENSITY TESTING (///~11. CONCRETE CYUNDER / PICK-UP 12. GROUT CUBES 13. FIELD GRADATION / LIME 14. FIELD REPORTS 15. FIELD SAMPLING * 16. TENDON / PROOF LOAD INSPECTION 17. PIER INSPECTION / RETENTION 18. SEE ATEACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEE :~N.'/~ REPORT No.: Z::9 z,/-~ SHEET // OF ~ telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineerhg geoscience consullanls PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA TRUCK No, TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 1 //] '2-/'p SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: SUPPLIER TXI SET 2 /p. yT CYL. No. MIX SLUMP DATE · (in.) % PLACED I DATE TESTED t/ TOTAL AGE LOAD (c~ays) (Ibs.] COMPR. STRENGTH (psi} ,,c-,,c-] ~ MIX DESIGN SET 1 SET2 I CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.) __.(L~s.) (Ibs,) (,galsls___~k} TECHNICIAN ENGINEER REPORT No, REQ'D REQ'D 7 DAY 28 DAY (psi) _(psi) ADMIX 4' $ao 51,z,-, SHEET ~__-. OF telephone (214) 941-3808 fax'(214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 1: '! i HENLE.Y JOHNSTON & ASSOCIATES, INC. englneerbg geoscience consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 I/, BRIEF DESCRIPTION AND LOCATION: WEATHER: C~-~-~ , 9~' TIME: START WORK: Ig.'~'u STOP WORK: Z/L'~"o WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. ( V'~. CONCRETE INSPECTION ( ~ 1. ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. ( ) 4. SELECT FILL PLACEMENT ( ) 13. ( ) 5. LIME STABILIZATION ( L"/"14. ( ) 6. FOOTING INSPECTION ( ) 15. ( ) 7. GENERAL INSPECTION * ( ) 16. ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. ( ) 9. TIE-BACK INSPECTION ( ) 18. FIELD DENSITY TESTING CONCRETE CYUNDER / PICK-UP GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE A'FFACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER: REPORT No.: SHEET / OF ~ telephone (214) 941-3808 Iax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 I-iENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT //5 g/,7~2 /Z[37~, I z ,/3' SET 1 LOCATION SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: ~,/z~.//~,~ SUPPLIER TXI SET 2 /,~""~,,,:' Sz'~'~, k.~z6 /3//f ///oF CYL. No, SLUMP TOTAL COMPR. DATE DATE AGE LOAD STRENGTH PLACED TESTED (day~l (Ibs.) /f i 7 155 0 MIX DESIGN SET1 SET2 CEMENT FINE COARSE CONTENT AGGR. AGGR. (bs.) (lbs.) (~bs.) TECHNICIAN ENGINEER REPORT No. W/C REQ'D REQ'D RATIO 7 DAY 28 DAY (galslsk) (psi) (psi) z/zz,,u /,:. :y j: SHEET ADMIX telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas. Texas 75203 - 1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 WEATHER: TIME: START WORK: DELAYS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ) 1. PIER INSPECTION / FOUNDATION ) 2. CONCRETE INSPECTION ) 3. SUB-SURFACE DRAIN INSTALLATION ) 4. SELECT FILL PLACEMENT ( ) 5. LIME STABILIZATION ( ) 6. FOOTING INSPECTION ( ) 7. GENERAL INSPECTION * ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 9. TIE-BACK INSPECTION REMARKS: 10. FIELD DENSITY TESTING 11. CONCRETE CYUNDER / PICK-UP 12. GROUT CUBES 13. FIELD GRADATION / LIME 14. FIELD REPORTS 15. FIELO SAMPLING * 16. TENDON / PROOF LOAD INSPECTION 17. PIER INSPECTION / RETENTION 18. SEE ATTACHED SHEETS FOR TEST RESULTS TECHNICIAN: "'~~ .(~z~ / ENGINEER: REPORT No.: (~:)~ 2,-- SHEET / OF telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas. Texas 75203-1025 "t HENLEY JOHNSTON & ASSOCIATES, INC. engineering geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: WEATHER: .F,/',~.,,- TIME: START WORK: DELAYS:/:2v,,,~//Z/,,9, Z~J,,.-.~,,~x,,//_ DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( )~. (L--'~. ( )3. ( )4. ( )S. ( )6. ( )7. ( )S. ( )9. PIER INSPECTION / FOUNDATION ( CONCRETE INSPECTION ( SUB-SURFACE DRAIN INSTALLATION ( SELECT FILL PLACEMENT ( LIME STABILIZATION ( FOOTING INSPECTION ( GENERAL INSPECTION * ( REINFORCEMENT STEEL INSPECTION ( TIE-BACK INSPECTION ( )10. )11. ) 12. ) 13. ) 14. 15. 16. 17. 18. FIELD DENSITY TESTING CONCRETE CYLINDER / PICK-UP GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE A'FFACHED SHEETS FOR TEST RESULTS REMARKS: REPORT No.: p//~ SHEET / OF ~ telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203 - 1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: /~/~:/ DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 F, WEATHER: /'/a"~ZZ~ TIME: START WORK: DELAYS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( )~. ( )2. ( )3. ( )4. ( )5. ( )6. ( )7. ( )8. ( )9. PIER INSPECTION / FOUNDATION ( ) 10. CONCRETE INSPECTION ( ~---)-"11. SUB-SURFACE DRAIN INSTALLATION ( ) 12. SELECT FILL PLACEMENT ( ) 13. LIME STABILIZATION (b--") 14. FOOTING INSPECTION ( ) 15. GENERAL INSPECTION * ( ) 16. REINFORCEMENT STEEL INSPECTION ( ) 17. TIE-BACK INSPECTION ( ) 18. FIELD DENSITY TESTING CONCRETE CYUNDER / PICK-UP GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE A'I'I'ACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER: REPORT No.: SHEET telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION CONCRErE STRENGTH TESTS JOB No.: 6878 DATE: ,~-/~ SUPPLIER 'I'XI SET 2 ..s - ,4:-,--, /,.'.,// CYL. No. MIX SLUMP (in,) / DATE PLACED /'//;- ~xb DATE AGE TESTED (days) ½"l/'-gf .t /I q- T-gr~ ~ ,V TOTAL LOAD (Ibs.) COMPR. STRENGTH (psi) MIX DESIGN SET1 SET2 CEMENT FINE COARSE W/C REQ'D CONTENT AGGR. AGGR. RATIO 7 DAY (Ibs.) (Ibs.) (Ibs.) (gals/sk) (psi) REQ'D 28 DAY ADMIX TECHNICIAN ENGINEER REPORT No. 02-- e, SHEET 2 OF 2- telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 I HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETETEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION CO NCR ETE STR EN GTH TESTS JOB No.: 6878 DATE: Z¢-/-?- - P ,~' SUPPLIER TXI SET2 CYL. No. / MIX SLUMP DATE iy,/!~, PLACED ~. ~r-/ 2 -? ~ DATE TESTED b' '/v- )L; ~1 I/ TOTAL COMPR. AGE LOAD STRENGTH (days) (Ibs.) (psi) 7 / ~3, ~ oo 5'YZ~2 ~ t5 '7, 1 ao - 5~ ~ ~ /~ ~ ~ o CEMENT MIX CONTENT DESIGN (Ibs.) ssr 1 d, SET2 TECHNICIAN' ENGINEER REPORT No. FINE COARSE W/C AGGR. AGGR. RATIO (Ibs.) (Ibs.) (gals/sk) REQ'D REQ'D 7 DAY 28 DAY (psi) (psi) / SHEET 2- OF '~- ADMIX telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 "1 HENLEY JOHNSTON & ASSOCIATES, INC. engineerlag geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETETEMP. AIR CONTENT -z/,/ i z ; ,-/~ SET 1 LOCATION '7 .t~ L ~ F1' TA t4 K. SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: SUPPLIER TXI SET 2 CYL. No. MIX / _z I SLUMP DATE (in.) PLACED I~' ~"""; 1 DATE TESTED MIX DESIGN SET1 SET2 TECHNICIAN ENGINEER REPORT No. CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.) (Ibs,) (Ibs.) (9als/sk) TOTAL COMPR. AGE LOAD STRENGTH __Jdays) (Ibs.) (psi) REQ'D 7 DAY (psi) REQ 'D 28 DAY · (psi) ADMIX z/Z~,o i~,~,,'-r, c r z A FF~--,~-,.. SHEET telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 "1 RENL.E,Y JOHNSTON & ASSOCIATES, INC. engineering geoscience consultanls PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET I TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT //z 3-z~/~, /s." zz /s., SET 1 LOCATION SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: $/Z3~/,,~ SUPPLIEFt TXI SET 2 CYL. No. MIX }zz'7-rS SLUMP DATE DATE TESTED TOTAL AGE LOAD (days) (Ibs.) 7 //--/7 9~o 7 lyj/~ COMPR. STRENGTH !psi) ,g/3 () MIX DESIGN SET1 SET2 CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.) (Ibs.) (Ibs.) (galslsk) TECHNICIAN ENGINEER REPORT No. REQ'D REQ'D 70AY 28 DAY (psi) (psi) ADMIX SHEET Z OF telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC, engineering geoscience consultams PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT i Z: 9'Z' SET 1 LOCATION SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: DATE: SUPPLIER TXI SET 2 L /A'A CYL. No. / ,/ SLUMP DATE DATE MIX i5:~?: PLACED TESTED TOTAL AGE LOAD (days) (Ibs ,) '7 11~3 5'DD 7 i COMPR. STRENGTH (psi) _ MIX DESIGN SET 1 SET2 CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.) (Ibs.) (Ibs.) (gals/sk) TECHNICIAN ENGINEER REPORT No. REQ'D REQ'D 7 DAY 28 DAY (p__.~) (psi) ADMIX SHEET telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHN'STON & ASSOCIATES. INC. engineerhg goDscience consultar~ts PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES. INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT 5o7 IIz ~6,o SET 1 LOCATION //j ,v' ,<' -_%"/'c'2'~ /,f_./,4 ~ c- SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: SUPPLIER TXI SET 2 CYL. / M Ix __________________?Z T, S-L7, S L UM P DATE (in.) PLACED DATE TESTED TOTAL AGE LOAD (days) (Ibs.) "1 I/'-// 'l I//29 COMPR. STRENGTH (psi) . CEMEN'F FINE COARSE W/C REQ'D REQ'D MIX CONTENT AGGR. AGGR. RATIO 7 DAY 28 DAY DESIGN (!bs,) (Ibs,) (Ibs.) (gals/sk) (psi) (psi) SET 1 z/'Z,a,d SET2 TECHNICIAN ENGINEER REPORT No. SHEET Z OF Z ADMIX telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025