Loading...
ST8402-CS 860903GINN, INC. September 3, 1986 CONSULTING ENGINEERS Mr. Mike Terrell Midwest Bridge Corp. 802 N. Kealy Le~isville, TX 7511~17 Dear Mr. Terrell: We are in receipt of your August 26, 1986 letter and acknowledge August 7, 1986, as the substantial completion date for the above referenced project. Please proceed with scheduling a final walk-thru with our inspectors and the City of Coppell as soon as possible. Prior to final payment being issued, the City of Coppell requires certain items to be submitted as per the Contract Documents and Specifications, Division One, Section 01700, "Contract Closeout." Please pursue these items at your earliest convenience. Later this week we shall be sending you mylar sepias of the construction plans for which you can provide the City the as-built information. The City requires these to be stamped "As-Builts" and requires the original plans with two blue line prints be returned. The City of Coppell and Ginn, Inc. have appreciated your cooperation on this project and have enjoyed working with you and your staff. Please call us if you have any questions. Sincerely, Kevin Peiffer /ss cc: Ed Powell Wayne Ginn