Loading...
WA9601-LR 980831HENLEY JOHNSTON & ASSOCIATES, INC, Transmittal Date: 31 August 1998 To: Shimek, Jacobs & Finklea, L.L.P. Attn: Mr. Gary C. Hendricks, P.E. Project: Wagon Wheel Ranch Elevated Storaqe Tank Gentlemen: Henley-Johnston & Assoc., Inc. transmits herewith the following: SLna'L~i~y Of Concrete Strength Tests and Daily Field Reports Comments: Report Nos. 029 thru 038 cc: Larry Davis, City of CopFell Joe Swinnea, iandmark Sincerely yours, Herbert C. Crowder Henley-Johnston & Assoc. , Inc. Project No. 6878 telephone (21,I) 9,11-3808 fax [214) 9,13-7645 235 Morgan Ave.. Dallas. Texas 75203-1088 HENLEY JOHNSTON & ASSOCIATES, INC. engineerbg geoscience consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: DALLY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: -~ 6878 //,/-. TIME: START WORK: DELAYS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. ( v-)-"2. CONCRETE INSPECTION ( ~--)-'11. ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. ( ) 4. SELECT FILL PLACEMENT ( ) 13. ( ) 5. LIME STABILIZATION ( ~ 14. ( ) 6. FOOTING INSPECTION ( ) 15. ( ) 7. GENERAL INSPECTION* ( ) 16. ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. ( ) 9. TIE-BACKINSPECTION ( ) 18. REMARKS: z',,Z / // FIELD DENSITY TESTING CONCRETE CYLINDER / PICK-UP GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION 1 RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER: REPORT No.: SHEET telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. ongineering geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES. INC. COPPELL. TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION n/9/--s / A' : ~,~) /,z,~,,, ZL,_--/ / ,// ,:.,, SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: ~' -// SUPPLIER TXI SET 2 CYL. No. / _2 MIX SLUMP .... (jn;l DATE DATE PLACED TESTED 9x/,Y TOTAL AGE LOAD ~ldjv~. fibs .) COMPR. STRENGTFi (psi/ MIX DESIGN SET1 SET2 CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.) (Ibs.) (Ibs.) (gals/sk) REQ'O REQ'D 7 DAY 28 DAY (p__.~) (psi) ,',//2_~/) ADMIX TECHNICIAN ENGINEER REPORT No. SHEET 2, OF 2- telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engtneerhg geoscience consultants DALLY FIELD REPORT PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 ,/-/<. C, BRIEF DESCRIPTION AND LOCATION: //.' :,.-, /'-~-/'x,~/,.-.--..,.-./,~.:,.--,, WEATHER:/~,,--/~ r, , /.,-,,-, J?--- , 9'/" TIME: START WORK: DELAYS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. FIELD DENSITY TESTING (/y""2. CONCRETE INSPECTION ( ~ 11. CONCRETE CYLINDER / PICK-UP ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. GROUT CUBES ( ) 4. SELECT FILL PLACEMENT ( ) 13. FIELD GRADATION / LIME ( ) 5. LIME STABILIZATION ( ""T 14. FIELD REPORTS ( ) 6. FOOTING INSPECTION ( ) 15. FIELD SAMPLING * ( ) 7. GENERAL INSPECTION * ( ) 16. TENDON / PROOF LOAD INSPECTION ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. PIER INSPECTION / RETENTION ( ) 9. TIE-BACKINSPECTION ( ) 18. SEE A"R'ACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER: REPORT No.: '7~/.Z~__/-..,-.- SHEET / OF 2_ telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: CO NTRACTO R: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION .-: L'.' //2. C.¢¥ / //,' :; 2'/)-i,-~ /./. ,-' 4/-/ .,/-':-//,/., ,. SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: DATE: SUPPLIER 6878 .~ /.~ .~: t, TXI SET 2 CYL. No. i :) MIX ; / '~ '15' SLUMP (in.); .,.?,,_/:,. ,/_, DATE PLACED z/,:.-6./ DATE AGE TESTED (days) [' ,'z f>d 7 9'-/l- 95' 2 ~'- TOTAL LOAD (~bs.) 7'¢7, ?:~ 1'-/'7,, ,,COO COMPR. STRENGTH (psi) _rzf o CEMENT FINE COARSE W/C REQ'D REQ'D MIX CONTENT AGGR. AGGR. RATIO 7 DAY 28 DAY DESIGN (Ibs.) (Ibs.) (Ibs.) (gals/sk) (psi) (psi) SET 1 4~ ,2cc SET2 TECHNICIAN ENGINEER REPORT No. SHEET 2---. OF ADMIX telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA LoL.P. DALLY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 S WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. FIELD DENSITY TESTING (v~)2. CONCRETE INSPECTION (/,/)d 1. _~.~~ ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. GROUT CUBES ( ) 4. SELECT FILL PLACEMENT ( ) 13. FIELDGRADATION/LIME ( ) 5. LIME STABILIZATION ( ~FIELD REPORTS ( ) 6. FOOTING INSPECTION ( ) 15. FIELD SAMPLING * ( ) 7. GENERAL INSPECTION * ( ) 16. TENDON / PROOF LOAD INSPECTION ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. PIER INSPECTION / RETENTION ( ) 9. TIE-BACKINSPECTION ( ) 18. SEE A'FFACHED SHEETS FOR TEST RESULTS REMARKS: TECHNICIAN: ENGINEER: REPORT No.: SHEET telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. enginoering geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEblP. AIR CONTENT SET 1 LOCATION 6 '// SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: /,'- ~C SUPPLIER TXI SET 2 CYL No. MIX SLUMp1tt9 I TOTAL DATE DATE I AGE LOAD PLACED TESTED ___ _~. ribs .) COMPR. STRENGTH MIX DESIGN SET 1 SET 2 CEMENT CONTENT 0bs.) FINE COARSE W/C REQ'D REQ'O AGGR. AGGR. RATIO 7 DAY 28 DAY (Ibs.) (Ibs.) ~als/sk) (psi) . (psi) ADMIX TECHNICIAN ENGINEER REPORT No. /1,1 SHEET OF telephone (214) 941-3808 ! fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 1'" I !' HENLEY JOHNSTON & ASSOCIATES, INC, englneerhg geosclence consultants DAILY FIELD REPORT PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 WEATHER: ~ ) )~-~,,~¢Z ~/:7, c:~ f"~ ~ TIME: STAR~'~'/: /zP,'LS"/~ STOP WORK: Z ;~ ',~ T~f DE~YS: ll;~- iz,'/~ ~T~ c~~ T~ ~tt;~ Ct, ~r~ ' ~~ WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION:. (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. ( ,>~)2. CONCRETE INSPECTION (~-1"'11. ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. ( ) 4. SELECT FILL PLACEMENT ( ) 13. ( ) 5. LIME STABILIZATION ( "1"' 14. ( ) 6. FOOTING INSPECTION ( ) 15. ( ) 7. GENERAL INSPECTION * ( ) 16. ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. ( ) 9. TIE-BACKINSPECTION ( ) 18. FIELD DENSITY TESTING GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: ENGINEER: REPORT No.: SHEET '2 OF L telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dalbs, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants CONCRETE STRENGTH TESTS PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS JOB No,: 6878 DATE: ,', X~i f /~ SUPPLIER I SAMPLE DATA SET 1 SET 2 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION 1'2. / %, SET 2 LOCATION CYL. ~ No. NIIX ¢  TOTAL SLUMP DATE DATE LOAD (i0~~5 I~?~,,~ TESTEO (Ibs.) Z~T '2 'i ~/Zf//2~ ~/ ~,/ ~ ~/~ ~ AGE (day_E), '2 zf MIX DESIGN SET1 SET2 CEMENT CONTENT .(Ibs.) FINE COARSE W'./C REQ'D REQ'D AGGR. AGGR. RATIO 7 DAY 28 DAY (Ibs.) (Ibs.) (g~lslsk) (psi) (psi) TECHNICIAN ENGINEER REPORT No. SHEET COMPR. STRENGTH (psi) o ADMIX telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 I' ! I HENLEY JOHNSTON & ASSOCIATES, INC. englneerbg geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. DALLY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 BRIEF DESCRIPTION AND LOCATION: WEATHER: ~n , / ~1a4/14,'C~ / TIME: START ~K: DE~YS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. ( ) 2. CONCRETE INSPECTION ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. ( ) 4. SELECT FILL PLACEMENT ( ) 13. ( ) 5. LIME STABILIZATION ( ( ) 6. FOOTING INSPECTION ( ) ( ) 7. GENERAL INSPECTION * ( ) ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) ( ) 9. TIE-BACK INSPECTION ( ) GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS 15. FIELD SAMPLING * 16. TENDON / PROOF LOAD INSPECTION 17. PIER INSPECTION / RE'FENTION t 8. SEE A'FFACHED SHEE'I'S FOR TEST RESULTS REMARKS: TECHNICIAN: ENGINEER: REPORT No.: SHEET ( OF ( telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK. JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: "7 t,F-t , WEATHER: TIME: START WORK: /gv'~d DELAYS: DAILY FIELD REPORT REPORT DATE: HJA JOB No: 6878 TECHNICIAN://.///. REVIEWED BY: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ) 1. IER INSPECTION / FOUNDATION ( ) I O. ~~2:CONCRE'T'E INSPECTION ( ) 11. ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. ) 4. SELECT FILL PLACEMENT ( ) 13. ) 5. LIME STABILIZATION ( ) 14. ) 6. FOOTING INSPECTION ( ) 15. ) 7. GENERAL INSPECTION * ( ) 16. ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. ) 9. TIE-BACK INSPECTION ( ) 18. FIELD DENSITY TESTING CONCRETE CYUNDER / PICK-UP GROUT CUBES FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENOON/ PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE ATFACHED SHEDS FOR TEST RESULTS REMARKS: ENGINEER: REPORT No.: SHEET / OF ~ telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas75203-1025 ! ..... i HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: -5'7,,--~-z ,k/',a/., ., ~ ~'~ WEATHER: ~/_~,arz', TIME: START WORK: OELAYS: DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 //./,"/ e 2/(; /,,v',,,'2 /..2t,~ / STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. FIELD DENSITY TESTING ( V'F"'2. CONCRETE INSPECTION ( ) 11. CONCRETE CYUNDER / PICK-UP ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. GROUT CUBES ( ) 4. SELECT FILL PLACEMENT ( ) 13. FIELD GRADATION / LIME ( ) 5. LIME STABILIZATION ( ) 14. FIELD REPORTS ( ) 6. FOOTING INSPECTION ( ) 15. FIELD SAMPLING * ( ) 7. GENERAL INSPECTION * ( ) 16. TENDON / PROOF LOAD INSPECTION ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. PIER INSPECTION / R~'q'ENTION ( ) 9. TIE-BACKINSPECTION ( ) 18. SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: TECHNICIAN: ENGINEER: REPORT No.: SHEET / OF ~ telephone (214) 941-3808 fax (214) 943-7645 · 235 Morgan Ave., Dallas, Texas7520,3-1025 i I | S O & ASSOCIATES, INC. englneerbg geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. WEATHER: /K~A~-,r~X' (/~v,~/,, , f'z,,' ~ TIME: START WORK: 17_,;~,~,, D E LAYS: //-~/r~,~ ~,,-" ,.¢-.~Z' 'r/f/,,,~'z',,~' DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( )3. ( )4. ( )5. ( )s. ( )7. ( )a. ( )9. PIER INSPECTION / FOUNDATION ( ) 10; CONCRETE INSPECTION ( ) 11. SUB-SURFACE DRAIN INSTALLATION ( ) 12. SELECT FILL PLACEMENT ( ) 13. LIME STABILIZATION ( ) 14. FOOTING INSPECTION ( ) 15. GENERAL INSPECTION * ( ) 16. REINFORCEMENT STEEL INSPECTION ( ) 17. TIE-BACKINSPECTION ( ) 18. FIELD DENSITY TESTING CONCRETE CYUNOER / PICK-UP GROUT CUBES FIELO GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: ENGINEER: REPORT No.: telephone (214) 941-3808 fax (214) 943-7645 SHEET / OF ~ 235 Morgan Ave., Dallas, Texas75203-1025 ~..' ! i ~Y JOHNSTON & ASSOCIATES, INC. englnoering geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. DAILY FIELD REPORT REPORT DATE: HJA JOB No: 6878 TECHNICIAN://. ,~, REVIEWED BY: BRIEF DESCRIPTION AND LOCATION: ~--~,vr,~'~7~ c2-~/,v~,~ ~,,-, W EAT H E R: ~_~¢.yc,,/ d~,,~,,p;,,,,, TIME: START WORK: DELAYS: STOP WORK: WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION 1 FOUNDATION ( ) 10. FIELD DENSITY TESTING ( Z2. CONCRETE INSPECTION ( ) 11. CONCRETE CYUNDER / PICK-UP ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. GROUT CUBES ( ) 4. SELECT FILL PLACEMENT ( ) 13. FIELD GRADATION / LIME ( ) 5. LIME STABILIZATION ( ) 14. FIELD REPORTS ( ) 6. FOOTING INSPECTION ( ) 15. FIELD SAMPLING * ( ) 7. GENERAL INSPECTION * ( ) 16. TENDON / PROOF LOAD INSPECTION ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. PIER INSPECTION / REFENTION ( ) 9. TIE- BACK INSPECTION ( ) 18. SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: ENGINEER: REPORT No.: /_2 Z' 7-' SHEET / OF ~., telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 i I i' HENLEY JOHNSTON & ASSOCIATES, INC. englneerbg geoscience consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. BRIEF DESCRIPTION AND LOCATION: TIME: /"1, .' DELAYS: DAILY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 STOP WORK:/Z' WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DUR. ING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) ~, ( )2. ( )3. ( )4. ( )5. ( )6. ( )7. ( )8. ( )9. PIER INSPECTION / FOUNDATION CONCRETE INSPECTION SUB-SURFACE DRAIN INSTALLATION SELECT FILL PLACEMENT LIME STABILIZATION FOOTING INSPECTION GENERAL INSPECTION * REINFORCEMENT STEEL INSPECTION TIE-BACK INSPECTION REMARKS: ( ) 1 o. FIELD DENSITY TESTING ( t/F'~. CONCRETE CYUNDER/~_~UP~ ( ) 12. GROUT CUBES ( )~3. ( )15. ( )16. ( )17. ( )is. FIELD GRADATION / LIME FIELD REPORTS FIELD SAMPLING * TENOON / PROOF LOAD INSPECTION PIER INSPECTION / RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS TECHNICIAN: ENGINEER: REPORT No.: SHEET f/ OF / telephone (214) 941-3808 fax (214) 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 1 HENLEY JOHNSTON & ASSOCIATES, INC, engineering geoscience consultants CONCRETE STRENGTH TESTS PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS JOB No.: 6878 DATE: I _ ~I- SUPPLIER TXI SAMPLE DATA SET 1 SET 2 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION CYL. No. MIX z_ %?_,q f 3 R'Ln ~ TOTAL COMPR. SLUMP DATE DATE AGE LOAD STRENGTH (in.) PLACED TESTED (days) (Ibs.) (psi) "z ~"L q MIX DESIGN SET1 SET2 CEMENT FINE COARSE W/C REQ'D CONTENT AGGR. AGGR. RATIO 7 DAY (Ibs.) (Ibs.) (Ibs.) (gals/sk) (psi) REQ'D 28 DAY (psi) ADMIX TECHNICIAN ENGINEER REPORT No. SHEET ?__ OF telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineering geoscience consultants PROJECT: C O NTRACTO R: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 D AT E: /':-/[" SUPPLIER TXI SET 2 ,/.',, ,:,,// CYL. No. / // {' MIX SLUMP DATE DATE AGE (in.) PLACED TESTED (days) / ,~' - / 7 9t-' i [' " 7 ) / 2'-T-¢,,';',2 ,'-," TOTAL LOAD (bs.) COMPR. STRENGTH (psi) /:'-,:' 7 L-' MIX DESIGN SET1 SET2 CEMENT FINE COARSE W/C REQ'D CONTENT AGGR. AGGR. RATIO 7 DAY (Ibs.) (Ibs.) (Ibs.) (9als/sk) (psi) REQ'D 28 DAY (psi) ADMIX TECHNICIAN ENGINEER REPORT No. SHEET z7' OF 2- telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave.. Dallas, Texas 75203-1025 HENLEY JOHNSTON & ASSOCIATES, INC. engineerhg geoscience consultants PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA SET 1 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT /,z ; s' 9' SET 1 LOCATION SET 2 LOCATION CONCRETE STRENGTH TESTS JOB No.: 6878 DATE: b~ .-/2 - SUPPLIER TXI SET 2 CYL. No. / 2- 3 MIX '2 Z' 5'/: SLUMP DATE % ,~o~o DATE TESTED 6" '19- 2t7 II TOTAL COMPR. AGE LOAD STRENGTH (days) (Ibs.) (psi] .7 153, 3 oo 5'YZO -7 15 'l, I au EJToa CEMENT MIX CONTENT DESIGN (Ibs.) SET2 TECHNICIAN' ENGINEER REPORT No. FINE COARSE W/C AGGR. AGGR. RATIO (Ibs.) (Ibs.) (gals/sk) REQ'D REQ'D 7 DAY 28 DAY (psi) {psi) SHEET 2- OF "z_- ADMIX telephone (214) 941-3808 ! fax (214 943-7645 235 Morgan Ave., Dallas, Texas 75203-1025 I .... I i'