Loading...
ST8201-CS 890619 GINN, INC. C(')NSI.-LT~NG 'I£N(;INEERS June 19, 1989 I-Ir. Scott B~~.E. L.H. Lac~L/Co. P.O. ~x 541297 Dallas, TX 75019 Re: Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road Dear Mr. Balch: We have received your June 2, 1989 letter requesting additional compensation under Item 100-Preparing Right-of-Way for the removal of the two McDonald's driveways and the temporary paving and drainage constructed as a part of the Creekview Subdivision. In order to complete our review and evaluation of this request we need to know the following: 1. The time and date that L.H. Lacy Co. was directed or ordered to perform Extra Work; and 2. The amount of additional compensation sought in this request with supporting documentation which will substantiate the amounts of said compensation. If it is L.H. Lacy Company's intention to request compensation on the basis of hourly labor equipment and material costs, please submit, with the above, a listing of the rates which were in effect at the time L.H. Lacy Company bid the project, and a copy of those rates in effect at the time the actual work mentioned herein was accomplished. If you have any questions, please call me. Sincerely, - ..... -,-~.. / ~,. .i' ..~., .~.....~._.~ . . John C. Karlsruher, P.E. [,..r-2'.,-~-~--...--;-:~-r--,-- Project Engineer ':" ............... JCK/dsp '~, · !'~ ~. cc: Russell Doyle, P.E.~ H. Wayne Ginn, P.E. i~,>' Randy Fleming File 378 lOf:3~F_l SHADY ] [b'-~ I1.. DALLAS, f'X SLJJ Ii.: ]Ou. L.U'-]I Iii DEAR MR, I(ARL. SRUHER, O~l 'TILE A[]OVE REFE:RRENEE:D I:'FtOJEC'] I'~,[_ FOI..I_t}W]N~ ITEMS ~E: NO1 SHFJNI'.I DI'; -IHE OhiE (]) CONCI?!]I'E DRIVE ONE (1) CUN[:RI.i'I'E Df]I'J[~ IIl~ll' E)ERVED RcDONAI_D'Ei ~ ~PPROX1M~'TE S'I'R'TION ~62-~00 AI-~PI-]BX]MA'II:LY ONE [IUNf~I~iiD APF'IIOX]PIA[Ei ~alA'l .[(.)N l'l ONE AS[~HALT Dt~IVE .~ f-~lJBLl[: S'IO[iAI.;E .;~ APPf-~OXlM~I'[E S'I'~TION 9~+50 Tile L, ~t, LACY CD, WAINI'S , ~ I NCE. F~EL.Y ~ L¢COi I- BALL]H, f~.U.