Loading...
ST8201-CS 890524GINN, INC. CONSULTING ENGINEERS May 24, 1989 Mr. Russell Doyle, P.E. city of Coppell P.O. Box 478 Coppell, TX 75019 Re: Denton Tap Road Improvements from Belt Line to Sandy Lake Road - Mr. Greer Dear Mr. Doyle: In response to your 5/15/89 Handwritten Memorandum, attached, I have met with the Contractor and discussed his proposed construction schedule. With the placement of concrete for the adjacent left-turn lanes and McDonald's driveways to be completed by Thursday, May 25, at least 7 days of cure time should be allowed prior to allowing traffic on the new paving. Therefore, it appears that it will be June 2, 1989 before these areas can be used by vehicles. Please call me if you have any further questions. Sincerely, John C. Karlsruher, Project Engineer PoE. JCK/dsp cc: Scott Balch, P.E. - L.H. Lacy Co. H. Wayne Ginn, P.E. Randy Fleming File 378 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900