Re:
Denton Tap Road Improvements
from Belt Line Road to Sandy Lake Road
Dear Mr. Hinckley:
I greatly appreciate your letter and photographs of April 21,
1989 concerning damages to the drives and sprinkler systems at
Town Oaks Centre. We are directing L.H. Lacy Company, the
Contractor, to address your specific concerns by copy of this
letter.
The issues regarding backfill behind the curb are getting our
specific attention since we have had similar experiences to yours
on other projects with other Contractors.
It is our understanding that the brick pavers in the driveways
will be repaired or replaced as necessary during the time frame
in which the Contractor is installing similar pavers at the
intersections on this project.
The completion date for this contract is June 14, 1989. We do
not know of the Contractor's specific schedule for clean-up in
front of your shopping center, but request of him by copy of this
letter to contact both you and I in this regard.
If we can be of further assistance, please call.
Sincerely,
John C. Karlsruher, P.E.
Project Engineer
JCK/dsp
Scott Balch, P.E. - L.H. Lacy Co.
Randy Fleming w/original photos
H. Wayne Ginn, P.E.
17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900
April 21, 1989
A Development ~f
Mr. John Karlsruher, Project Engineer
Ginn & Associates
17103 Preston Road
Suite 100, LB-118
Dallas, Texas 75248
RE: Denton Tap Road Construction
Dear John:
! am writing this letter concerning Denton..?.Ta
construction, and in particular, certain~items~'~>~
been brought to my attention which need re
Lacy, the construction company on the project/?
TownOaks Shopping Centre area:
(1) Coppell's City Engineer, Russell~':Do~'le
sprinkler system along Denton Tap.Road~ is!
~water in the path of oncoming
advised us this was caused by L. H. Lacy'
the existing sprinkler system lines. The~
equipment has broken several of the sprinkler'.
that are outside of the constructions-area
street, .~and which, of course, ~should'be
L. H. Lacy. The sprinkler heads that.~,are
missing, you will see from the enclosed
gl, were obviously caused by construc
area for the Denton Tap Road paving. We bel
is the reason why water is on
(2) There has been damage to the br'ick'~'paver
leading into the shopping center which~
be~ repaired and replaced by the contrs
photo #2.
(3)
Berm reconstruction. We recogniz
construction is not finished, and Lac
an opportunity to yet remove construct
the area. However, when the construction
12201 MERIT DRIVE / SUITE 1~0 1 DALLAS, TEXAS 752511 (214) 991.4600
Mr. John Karlsruher
April 21, 1989
Page 2
intersection of Denton Tap Road and Sandy Lake:.was
completed, we were unable to secure the cooperation
of the contractor to remove concrete and othe]
construction materials left on our propert)
avoid a re-occurrence of this problem, we are'
calling to your attention these~particular~.-areas
identified in the other photographs'..attached~'.,~'.~
would anticipate that the berms.be reconstructed:
shaped in such a way as to enable the~continuation
the maintenance of the landscape in this. area!i'and
resodding. In particular, we are expecting
construction debris not be buried, but'-removed~?fr'~m?:.,
the site. Otherwise, it will create a safety hazard
for the maintenance crew which maintains.:',.the
landscaping of TownOaks Centre. ."
We expect that the asphalt that has been placed::~
up the broken brick pavers is only ~ temporary measure
will be removed and replaced by brick pavers~ma~hing
color and design of those which were in place~.pri,
construction of Denton Tap Road. The heavy'i~constru
equipment has caused the brick pavers to /settle
-northern most entrance and they will
flush with the others at grade.
Finally, I would appreciate knowing the 'dates
completion and cleanup for the Denton.Tap
TownOaks Shopping Centre so we can answer questiOns.i
raised by the Tenants.
Should you have any questions or need additJ
information, please do not hesitate to contact me.
Very truly yours,
Glen A. Hinckley
GAH/jc