Loading...
WA9601-LR 990322 (2) ' HENLEY JOHNSTON & ASSOCIATES, INC. Transmittal Date: 92 M~-h ] 999 To: Shimek, Jacobs & Finklea, L.L.P. Attn: Mr. Gary C. Hendricks, P.E. Project: Wagon Wheel Ranch Elevated Storaqe Tank Gentlemen: Henley-Johnston & Assoc., Inc. transmits herewith the following: Structural Steel In~ection Report #010 Comments: Report Nos. cc: Larry Davis, City of Coppell Joe Swinnea, Landmark Sincer. ely yours, H~bert C, Cz:~.~:ler Henley-Johnston & Assoc., Inc. Project No. 6878 telephone (214) 941.3808 fox {214) 943.7645 235 Morgan Ave.. Dallas. Texas 75203.1088 i tructural ii ~ l't spectao& esting Project: Coppell Wagon Wheel Elevated Water Tower Client: City of Coppell, Texas Owner: City of Coppell, Texas Architect: '~' ' Engineer: Shimek, Jacob, & Finklea, LL.P. Contractor: Landmark ' . Fabricator: Landmark 6808 EaseJew Sachse, Texas 75048 Phone (972) - 475-1849 Fax (972) - 412-9439 -Structural Steel Inspection Report Shop 'Fabrication or Field Erection REMARKS: Inspections / Testing were performed: Jobsite - Coppell, Texas. Inspected by: Doug Post AWS / Certified Welding Inspector ASNT / Certified Level 2 (UT,MT) Date: 1/26/98 Monday Thursday 3/8/99 -SHrs 3/11/99-5Hrs Tuesday Friday 3/16/99 -SHn 3/12/99 Wednesday Saturday 3/10/99-SHrs 3/13/99 Inspection / Testing consisted of: Visual Inspection of Welds on the Roof top sheel plate to plate connections for Compliance with Job Specifications, Contract Documents, Drawings and Governing Codes } AWS, AWWA, ASME,AISC, ASNT, ASTM, ANSI. Identification/Locationof.Inspection /Testing: Roof Top Shell plate to plate connections (Top& Overhead welds). Bottom plate to plate welds. Roof shell plates are 100% erecled. Welding complete on approx. 100% on plate to plate connections. Results of Inspection / Testing: Visual quality of welds are in compliance. Floor plate to plate welds, have been pressure tested for leaks and are In Compliance. Note: This concludes our Elevated Water Storage Tank, Field Welding Inspection. Weiden Qualification Records and Welding Procedures were reviewed at the jobsite and are in Compliance. NOTE: Inspection wa.~ performed to verify compliance to Project specifications, Contract Documents, Drawing, and Governing Codes } AWS, AWWA, ASME, AISC, ASTM, ASNT, ANSI. See attach~l inspection report(s) for the following items: a: Location oflnspection c: That are not in compliance with Contract Documes, b: Type of Inspection or Testing d: Travel Time.