Loading...
ST8201-CS 890307GINN, INC. Mr. Russell Doyle, P.E., City Engineer City of Coppell P.O. Box 478 Coppell, TX 75019 Re: Memorandum dated 2/25/89 (attached) Fire Hydrant Relocation - Denton Tap/Southwestern Blvd. Dear Mr. Doyle: In response to your inquiry regarding the above referenced subject, we offer the following comments. The plans originally called for only a vertical adjustment of this fire hydrant at this location. Relocation was not anticipated during the design phase due to the proposed roadway location not presenting any conflicts. During construction however, the roadway was required to be shifted further north in order to line up with Southwestern Town Lot Corporation's proposed Southwestern Boulevard Improvements (Gateway Park at Coppell). During this field change in alignment, via miscommunication, the fire hydrant did not get relocated at the same time and the resulting situation (ie. additional cost for move-in) occurred. The relocation work was completed the week of February 20, 1989. Please contact us if you have any further questions. Sincerely, /~ , Kevin Peiffer(~P. E. Project Engineer KP/dsp cc: H. Wayne Ginn, P.E. Randy Fleming File 255 17103 Preston Road · Suite 100 · LB 118 · Dallas, Texas 75248 · Phone 214/248-4900