Loading...
ST8805-LR 890531 (3) BAKER. SHIFLE7T, h E n g i n e e r s ~ Construction Materials Engineering Division · May 31, 1989 Coppell Independent School District PRO'ECT: Parkway Boulevard & 1201 Wrangler Drive High School Access Road Coppel I. Texas 75019 LOC^T,O.: Coppel I. Texas Attn: Ms. Vonlta White .EPO.TNO: 892488--11 Super i ntendent RESULTS OF FIELD DENSITY TESTS RETEST PERCENT TEST DATE OF TEST LOCATION PROCTOR FIELD FIELD OF NO. TEST TEST MOISTURE DENSITY PROCTOR NUMBER NO, % PCF DENSITY PARKWAY BOULEVARD: 235 5-30 - Sta 60+50, S of CL PW-8 16.5 107.3 98 236 " - Sta 60+50, N of CL PW-T&8 19.2 98.9 95 237 " - Sta 57+50, N of CL Fg/-7&8 19.4 98.8 95 238 " - Sta 57+50, S of CL F~/-7&8 18.9 99.6 96 239 " - Sta 54+81, N of CL PW-T&8 21.6 99.2 95 240 " - Sta 54+81, S of CL PW-7&8 18.3 103.0 99 Tests performed by T. Thompson TEST METHODS: ASTM D 2922, D 3017. D 1566, D 2167 OR O 2937 ,EM^,KS~ Tests performed on lime treated subgrade. BAKER-SHIFLETF. INC. 1 Above · 1 Jerry Parche' ~nsulting Engineers Attn: Mr. Jerry Parche', P.E. ~o~ Glenn C. Goss, P.E. 1 City of Coppell Texas 49386 A~-fn: Mr. Larry Davis 1 L.H. Lacy C~ntractors Attn: Mr. Sk lp Klemont PAGE 1 OF 2 5450 East Loop 820 South P.O. Box 15822 Fod Worth, Texas 76119 (817)478-8254 Metro 572-3411 PROJECT: Parkway Boulevard & High School Access Rd REPORTNO: 892488--11 RESULTS OF FIELD DENSITY TESTS RETEST PERCENT TEST DATE OF TEST LOCATION PROCTOR FIELD FIELD OF NO. TEST TEST MOISTURE DENSITY PROCTOR NUMBER NO. % PCF DENSITY HIGH SCHOOL ACCESS ROAD: 241 5-30 - Sta 19+50, W Of CL PW-7 20.4 98.0 97 242 " - Sta 17+00, E of CL PW-7 24.3 95.6 95 243 " - Sta 15+50, on CL PW-8 16.0 104.5 96 REMARKS: PAGE 2 OF 2 BAKER-SHIFLETT, INC.