ST8805-LR 890531 (3) BAKER. SHIFLE7T, h E n g i n e e r s
~ Construction Materials Engineering Division ·
May 31, 1989
Coppell Independent School District PRO'ECT: Parkway Boulevard &
1201 Wrangler Drive High School Access Road
Coppel I. Texas 75019 LOC^T,O.: Coppel I. Texas
Attn: Ms. Vonlta White .EPO.TNO: 892488--11
Super i ntendent
RESULTS OF FIELD DENSITY TESTS
RETEST PERCENT
TEST DATE OF TEST LOCATION PROCTOR FIELD FIELD OF
NO. TEST TEST MOISTURE DENSITY PROCTOR
NUMBER NO, % PCF DENSITY
PARKWAY BOULEVARD:
235 5-30 - Sta 60+50, S of CL PW-8 16.5 107.3 98
236 " - Sta 60+50, N of CL PW-T&8 19.2 98.9 95
237 " - Sta 57+50, N of CL Fg/-7&8 19.4 98.8 95
238 " - Sta 57+50, S of CL F~/-7&8 18.9 99.6 96
239 " - Sta 54+81, N of CL PW-T&8 21.6 99.2 95
240 " - Sta 54+81, S of CL PW-7&8 18.3 103.0 99
Tests performed by T. Thompson TEST METHODS: ASTM D 2922, D 3017. D 1566, D 2167
OR O 2937
,EM^,KS~ Tests performed on lime treated subgrade.
BAKER-SHIFLETF. INC.
1 Above ·
1 Jerry Parche' ~nsulting Engineers
Attn: Mr. Jerry Parche', P.E. ~o~ Glenn C. Goss, P.E.
1 City of Coppell Texas 49386
A~-fn: Mr. Larry Davis
1 L.H. Lacy C~ntractors
Attn: Mr. Sk lp Klemont PAGE 1 OF 2
5450 East Loop 820 South P.O. Box 15822 Fod Worth, Texas 76119 (817)478-8254 Metro 572-3411
PROJECT: Parkway Boulevard & High School Access Rd REPORTNO: 892488--11
RESULTS OF FIELD DENSITY TESTS
RETEST PERCENT
TEST DATE OF TEST LOCATION PROCTOR FIELD FIELD OF
NO. TEST TEST MOISTURE DENSITY PROCTOR
NUMBER NO. % PCF DENSITY
HIGH SCHOOL ACCESS ROAD:
241 5-30 - Sta 19+50, W Of CL PW-7 20.4 98.0 97
242 " - Sta 17+00, E of CL PW-7 24.3 95.6 95
243 " - Sta 15+50, on CL PW-8 16.0 104.5 96
REMARKS:
PAGE 2 OF 2
BAKER-SHIFLETT, INC.