ST8201-CS 881202FILl COPY GINN, INC. December 2, 1988 Mr. David M. Snyder, P.E. L. H. Lacy Company 10888 Shady Trail P.O. Box 541297 Dallas, Texas 75354-1297 Re: CONS{II/FING ENGINEERS Denton Tap Road Improvements from Belt Line Road to Sandy Lake Road; and from Sandy Lake Road to Denton Creek, Coppell Texas. Dear Mr. Snyder: We are transmitting herewith one copy of Change Order No. 1 for each project which have been executed by the City Manager on behalf of the City of Coppell. All subgrade stabilization, with the exception of the bridge approach slabs shall be performed in accordance with the terms of Change Order No. 1 and the John H. Haynes and Associates, Inc. November 4, 1988 letter, copy attached. As previously agreed L. H. Lacy Co. will modify the subgrade materials in the vicinity of Station 91+00 with 7% Cement at no additional cost beyond that for modification of the materials with 5% Cement. Since Ginn, Inc. has the responsibility for furnishing the initial materials testing for the project, we hereby elect to use the Modified Proctor Method (ASTM D-1557) with a minimum requirement of 95% density for testing the compaction of the treated subgrade materials. Measurement for Portland Cement and Portland Cement Modification of Subgrade Soils will be in accordance with the provisions for Pay Items 260, 264, and 264.1 as applicable. Payment for the Portland Cement Modification of Subgrade Soils will be made in accordance with the Unit Prices included in Change Order No. 1 and the existing Contract Pay Item Numbers and estimated quantities for Lime Treatment (Items 264 and 264.1, as applicable) and Lime Slurry (Item 260). Please call me if you have any questions. Sincerely, John C. Karlsruher, P.E. Project Engineer enclosures cc: Russell Doyle, P.E., City Engineer Frank Trando a:dtcemco.trn 17103 Ih'cston Road · Suite 100 · I,B 118 · Dallas, Texas 75248 · Phone 214/248-4900 (lnslructions on reverse side) . , //~ f · No./ i A.. . Coppell, Texas 75019 ooress) .... ~ .............................. ---.___ CONTRAC '-~L~... H. Lacy Co. _.~ P.O. Box S41297 Dallas, Texas 75354 ENGINEER: Ginn, Inc. 17103 Preston Rd., Suite CONTRACT FOR: · Denton Tap Road Improvements L.B. 118 from Belt Line Rd. to Sandy Lake Rd. Dallas, T~xas, 75248 J-378 ENGINEER's Project No. OWNER's Project No. You are directed to make the following changes in the Conlract Documents. Description: Substitute Portland Cement at $50.00/TON for Lime Slurry, Ty. A, 5%, 22.5#/SY at $61.00/TON (Pay Item 264); and Cement Treatment, mt. in place, for Lime Treatment, mat. in place at the same unit prices (Pay Item 260). Purpose ofChangcOrder: To achieve an estimated reduction in Estimated Contract Amount of $7,624.10, while providing a constructed project which will be equal to that which was originally specified. Attachmcnts: (List documcnts supporting change) 1. L.H. Lacy Co. letter of October 8, 1988 to Ginn, Inc. 2. ,lohn It. Hakn~es &.Associates, Inc. October 17, 1988 ±etter to Gxma, tnc, CHANGE IN CONTRACT PRICE: Original Contract Price $ 3,362,580.00 Previous Change Orders No. N/A to No. $ N/A Contract Price prior to thi~ Change Order 3,362,580.00 $ Net Increase (decrease) of this Change Order $ approx. [$7,624.10) Contract Price with all approved Change Orders 3,354,955.90 $ N/A CHANGE IN CONTRACT TIME: day~ or d~Ic Original Contract Time 365 Net change from previous Change Orders 0 days Contract Time Prior te this Change Order 365 da¥~ or dale Net Increase (decrease) of this Change Order 0 Contract 'rime with all approved Change Orders days o[ dale RECOMMENDED: 'by ' ' ' ' / r~.~i,.&~, APPROVED: by' EJCDC No. 1910-8-B (1983 Edition) Prepared by the Engineers' Joint Conlract L~)cumcnts Committee and endorsed by Thc Associated Gcnertal Contractors of America.