Loading...
ST8201-CN 881017 (2).' ', FILE I;OPY (Itnstructions on reverse side) No. 1 PROJE~ Road Improvements '-----lYA-T.~ OF ISSUANCE: k....._ from_S~gn~d~_~Lake~. R~oad to Denton Creek '") OWNER: Cite' ~-~ Coppell ---~ P.O. Box 478 (Name, Address) Coppe11, TX 75019 ~-.~-"CONTRAC~ ~ ~ OWNER's Project No. ~lqYSMB~hady Trai 1 Dallas, TX 753S4-1297 ENGINEER: Ginn, Inc. 17103 Preston Road., Suite 100 CONTRACT FOR: 'Denton Tap Road Improvements Dallas, TX 7S248 from Sandy Lake Road to Denton Creek ENGINEER's Project No. J379 You are directed to make the following changes in the Contract Documenls. Description: Substitute Portland Cement at $50.00/TON for Lime Slurry, Ty A, 5%, 22.5 #/SY at $67.00/TON and Lime Slurry TY A, 5%, 34 #/SY (9" thick) at $63.00/TON (Pay Items 264 and 264.1); and Cement Treatment, mat. in place for Lime Treatment, mat. in place at the Purpose of Change Order: same unit prices, (Pay Item 260) To achieve a reduction in estimated Contract Amotmt of approximately ~6,808.00 while providing a constructed project which will be equal to that which was originally specified. Attachments: (List documents supporting change) 1. L.H. Lacy Co. letter of OctOber 8, 1988 to Ginn, Inc. 2. John H. Haynes & Assoc., Inc. letter of Oct. 17, 1988 CHANGE IN CONTRACT PRlCE: CHANGE IN CONTRACT TIME: Original Contract Price Original Contract Time $ 1,789.363.03 365 days or daIc Prcvious Change Orders No, N/A to No. N/A Net change from previous Change Orders $ 0 day~ Contract Price prior to this Change Order Contract Time Prior to this Change Order $ 1,789,363.03 365 · days or du~c Net Increase (decrease) of this Change Order Net Increase (decrease) of this Change Order $ approx. ($6,808.00) 0 days Contract Price with ali approvcd Change Ordcrs Contract Timc with all approvcd Changc Ordcrs $ 1~782,555.03 365 di~ys or d.il¢ EJCDC No. 1910-8-B (1983 Edition) Prepared by flie Engineers' Join! Contract Documems Committe,:I~ ~ The Associated General Con!factors of America.