Loading...
ST8201-CS 880826August 26, 1988 1~0 l~d~ LrH TO: FROM: RE: Wayne Cinn, Ginn, Inc. Russell Doyle~y Engineer Denton Tap Ro~ad Projects It appears that I need to receive a s.ummar~ of the easements received and added Right-of-Way needed now or in the future to get Denton Tap Road to the width needed for our purpose for that facility. (i.e. Major Thoroughfare). I've had a number of conversations about these easeme'nts and the needed R.O.W., etc. Just lately I have had a conversation with Joe Bob iikes, and he is concerned about the roadway assessments and the taking of the ten-(10) feet of R.O.W. later. Please include in' your summary any and all information and dates from your files pertinent to the project and situation. I am told that when the Bond Program was passed, the assessment per foot was to be $65 to $80, (and it may be double that by now). Please provide the Council's action , and the other relevant back-up materials. (i.e. Council items packet - I can get the minutes after receiving your summary, if you don't have them). Include the eVents such as the meetings with the Landowners, dates, reSults, listing of executed easements, etc~. Thank you. RRD/lsg xc: Alan Ratliff, City Manager Shohre Daneshmand, Civil Engineer SUS 9/6/88 Please Return This Memo With Your Response. GINN. DENTON. TAP MEMO 1