ST8201-CS 880826August 26, 1988
1~0 l~d~ LrH
TO:
FROM:
RE:
Wayne Cinn, Ginn, Inc.
Russell Doyle~y Engineer
Denton Tap Ro~ad Projects
It appears that I need to receive a s.ummar~ of the easements received
and added Right-of-Way needed now or in the future to get Denton Tap
Road to the width needed for our purpose for that facility. (i.e. Major
Thoroughfare).
I've had a number of conversations about these easeme'nts and the needed
R.O.W., etc. Just lately I have had a conversation with Joe Bob iikes,
and he is concerned about the roadway assessments and the taking of the
ten-(10) feet of R.O.W. later.
Please include in' your summary any and all information and dates from
your files pertinent to the project and situation. I am told that when
the Bond Program was passed, the assessment per foot was to be $65 to
$80, (and it may be double that by now).
Please provide the Council's action , and the other relevant back-up
materials. (i.e. Council items packet - I can get the minutes after
receiving your summary, if you don't have them).
Include the eVents such as the meetings with the Landowners, dates,
reSults, listing of executed easements, etc~.
Thank you.
RRD/lsg
xc: Alan Ratliff, City Manager
Shohre Daneshmand, Civil Engineer
SUS 9/6/88
Please Return This Memo With Your Response.
GINN. DENTON. TAP
MEMO 1