Loading...
ST9801-CS001117Sent By: EBCC; 2143523201; Nov-20-00 8:20Abt; Page 2/2 F~X (214) 352-3201 TI;I EPHONE (214) 35e-6,561 ED BELL CONSTRUCTIO:N COMPANY POST OFFICE BOX 540787 10~06 HARRY HINES DALLAS. TEXA~,S 75354-0787 DALLAS, TEXAS 75220 November' 17, 2000 Mi'. Michael A. Ma~n, P.F.. £n§ineermg ~md Public Works Ci~ of Coppctt 255 P~kway ~lvd. CO~II, Texas '/b019-4409 R~: C:oppdl Road Rcc(ms~ction SH 121 to S~dy ~ke Road :. Coppcl[ proJcct ~ In rcsp(msc to your request for revised pricing fbr the spr~let he~ adjustment pay ite~ we ~ve been concem~ about the open ended nature of the bid item ~d the additional risk issumed by EBCC if we lower our price per head. The pay iteai description defines thc project limits for which:~EBCC m~st ensure that all spri~ler syst~ arc .fully functi,nal. The pay item also states d~t EBC, C is tesponsible~hr all wnrk ne~essa~ to ensure that all systems wifl~in the defined li~ts ate thlly thnctional and that ~1 c~ls associatod wi~ ~m~ing that fl~e sprin~er systems are t~dly ~nctional must be Mcoipom~ ~to ~c spfinklcrhcad aOiustment pay i~m. With a quantity of only twenty hctlds ~ct up ~ d~ contract, it was our belief tl~t fl~ w~-k would gmnafily revolve investigating the location of th~: heads, capping spri~er leads al the ROW, and cxt~ding those leads into ~e ROW atler ~mpleaon of~e paving. B~ upon thc mv~stlgatlons complemd to date and evaluafiom c~ducted by out migatot, il is our belief that 236 h~ds will be t~equ~ed and the majori~ of the proble~ wi~ the cx~ting systems have been identified. Within the defined prqicct limits, EBCC has ~countorcd five separate sprinkl~ system~ that h~ to be con~letely removed and replaced within the Ci~'s ROW. ~ese systems are spread out~ov~r 3500 LF of~; project and will rcq~c valve work, wh.htg, new water llne, ~d new h~ads. Out l~p sumPricc for this work is ~6,964. As s~ted previously, EBCC has remov~ ae sp[h~ler systems aad~nd Is cu~cntly ~ ~e pr~ess ot' rep~cing the systems. Wc arc~ p~ocecding with thc work necessary to complete l~is pt'qiect and the sp~ler work that m~t con~le;ed prior to completion of ~e parkway. The work ~ qucsti~ is within thc scope of work defined by thc sprinkler head adlus~nent pay item and must be cmnpleted p;ior to ~on~le;ion of the parkway. If it is the Ci~'s ~lent to no1 pay t~r ~is work or to remove ~is wo;k from EBCC'S~conlxact, then plca~ ~cc~ EBCC to stop wotk on this Rem. Please note that EBCC has already incurred costs ass~iated with this bid item and would expect to ~m~n~at~d l(~r those cos~ should the City ~lect to remove th~ item tYom the con~act If you bare any questions rcgarding fl~is info~ation, don't hesitate~Io contact our office. S~rjely, ~~ ~l Co]lSttl.UC ' Company Rbb~ D.' We xc: Mr. A. Scott Mauglm, E.I.'I'., Freese asxd Nichols, h~c., 17Cll N. Market Street S u itc 500 LB51, Dallas, 'l'c;~as 75202 i: AN EQUAL OPPORTUNITY EIIIIPLOYER