Loading...
WA9601-LR 990507HENLEY JOHNSTON & ASSOCIATES, INC. Transmittal Date: 7 May ] 999 To: Shimek, Jacobs & Finklea, L.L.P. Attn: Mr. Gazy C. Hendricks, P.E. Project: Waqon Wheel Ranch Elevated Storaqe Tank Gentlemen: Henley-Johnston & Assoc., Inc. transmits herewith the following: Da~ ] y F~e] d Reports, Sunma~ o~ Field Densi~ Tests and SLm,uary of Concrete Strength Tests Comments: Report Nos. 048 thru 050, inclusive cc: Larry Davis Cit'y ." = Coppell Joe Swinnea, Tsndmark Sincerely yours, Herbert C. Crowder Henley-Johnston & Assoc., Inc. Project No. 6878 telephone (214) 941-3808 fctx (214) 943-7645 235 Morgan Ave.. Dallas. Texas 75203,1088 1' HEI~LEY JOHNSTON & ASSOCIATES, INC. engineering geosclence consultants DAILY FIELD REPORT PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK. JACOBS & FINKLEA LL.P. REPORT DATE: HJA JOB No: 6878 TECHNICIAN: .,..~,r,,re REVIEWED BY: BR/~_ES~R~ND LOCATION: WEATHER: TIME: START WORK: f'.'l.,f .,z/2 STOP WORK: DELAYS: . '. WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( )~. (u,'I'2. ( )3. ( )4. ( )s. ( )6. ( )7. ( )8. ( )9. PIER INSPECTION /FOUNDATION CONCRETE INSPECTION SUB-SURFACE DRAIN INSTALLATION SELECT FILL PLACEMENT LIME STABILIZATION FOOTING INSPECTION GENERAL INSPECTION * REINFORCEMENT STEEL INSPECTION TIE-BACK INSPECTION 10. FIELD DENSITY TESTING 1 (,__CONCRETE CYUNDER)/PICK-UP 12. GROUT CUBES 13. FIELD GRADATION / LIME 14. FIELD REPORTS ' 15. FIELD SAMPLING * 16. TENDON / PROOF LOAD INSPECTION 17. PIER INSPECTION / RETENTION 18. SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: TECHNICIAN: ENGINEER: REPORT No.: telephone (214) 941-3808 fax (214) 943-7645 SHEET / OF 3 235 Morgan Ave., Dallas. 'Texas 75203-1025 HENLE~ JOHNSTON & ASSOCIATES, INC. engineerhg geoscience consultants PROJECT: WAGON WHEEL RANCH TANK CONTRACTOR: LANDMARK STRUCTURES, INC. LOCATION: COPPELL, TEXAS FIELD COMPACTION TESTS HJAJOB No.: PROJECT No.: DATE: 6878 LABORATORY FIELD TEST DATA DATA DENSITY: ASTM D 2922 ASTM D 698 MOISTURE: ASTM D 3017 FIELD OPT STD DRY % IDENT LOCATION / LAYER MC DEN DEN MC DRY No. (%) Coco (pct} (%) DEN I ~'5,~/ ',-j I~. IIo2J'Id 7,~,F,,P,.I~-,'- "/ COMPUES PROJECT SPECS. YES NO PROJECT SPECIFICATIONS MOISTURE: RANGE FROM -2 % TO +4 % FROM OPTIMUM MOISTURE CONTENT DENSITY: MINIMUM 95 % MAXIMUM DRY DENSITY (ASTM D 698) WEATHER: COMPACTION METHOD: REMARKS: TECHNICIAN ENGINEER REPORT No. telephone (214) 941-3808 fax (214) 943-7645 235 Morgan SHEET c~ OF .7 Ave., Dallas, Texas75203-1025 f · HENLEY' JOHNSTON & ASSOCIATES, INC. · engineering geoscience consuitors PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARl( STRUCTURES, INC. COPPELL, TEXAS SAMPLE DATA TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION SET 1 SET 2 LOCATION CONCRETE STRENGTFi TESTS JOB No.: 6878 DATE: SUPPLIER TXI SET 2 CYL. No. I MIX 18;z'TY' f SLUMP DATE PLACED I DATE TESTED 77 // TOTAL COMPR. AGE LOAD STRENGTH (d_~ay..~) (Ibs.) (psi) 7 I ig~ ld~ V,~Z,P MIX DESIGN SET1 SET2 CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.) (Ibs.) (Ibs.) (9als/sk) TECHNICIAN ENGINEER REPORT No. REQ'D REQ'D 7 DAY 28 DAY (psi) (psi) h,D,MIX SHEET ,~ OF ~ telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dal~as. Texas 75203-1025 f HENLEY JOHNSTON & ASSOCIATES, INC. englneerhg geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. DALLY FIELD REPORT REPORT DATE: 2./-/5 ":;/? HJA JOB No: 6878 TECHNICIAN: "Ij'c~-F H-~' REVIEWED BY: BRIEF DESCRIPTION AND LOCATION: WEATHER: C.{,,,-t-,.r TIME: START WORK: //:30 ~r,-,. STOPWORK: DELAYS: " WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( (J) 2. CONCRETE INSPECTION ( ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. ( ) 4. SELECT FILL PLACEMENT ( ) ( ) 5. LIME STABILIZATION ( Z 14. ( ) 6. FOOTING INSPECTION ( ) 15. ( ) 7. GENERAL INSPECTION * ( ) 16. ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. ( ) 9. TIE-BACK INSPECTION ( ) 18. GROUT CUBES FIELD GRADATION/LIME FIELD REPORTS ' FIELD SAMPLING * TENDON / PROOF LOAD INSPECTION PIER INSPECTION 1 RETENTION SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: TECHNICIAN: ENGINEER: REPORT No.: telephone (214) 941-3808 fax (214) 943-7645 SHEET ] OF D 235 Morgan Ave., Dallas, Texas 75203-1025 ! I lIENLEE,Z( f JOHNSTON & ASSOCIATES, INC. dnginoering geoscience consultaqls CONCRETE STRENGTH TESTS PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARl( STRUCTURES, INC. COPPELL, TEXAS JOB No.: 6878 DATE: 4-/5'-':?? SUPPLIER TXI SAMPLE DATA SET 1 SET 2 TRUCK No, TICKET No, TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION .... 7_.2 ___z ....;,,- ..........................~ .....'/ZZ Z: "': ...... SET 2 LOCATION CYL. No. / 3 MIX ~5 CEMENT MIX CONTENT DESIGN (Ibs.) SET1 SET2 TECHNICIAN ENGINEER REPORT No, SLUMP DATE (in.~ PLACED 5"" V~-/~' I I \/ v' FINE COARSE AGGR. AGGR. (bs.) (Ibs.) TOTAL AGE LOAD DATE TESTED ~s/ /Ibs.) ! '/-PP-~'I ,"-7 ......l iz'-tzao I I ~s "F' COMPR. STRENGTH (psi) W/C REQ'O REQ'O RATIO 7 DAY 28 DAY (Balslsk) (psi) (psi) ADMIX SHEET D---' OF ,:~ telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas, Texas75203-1025 f HENLEY JOHNSTON & ASSOCIATES, INC. engineering geosclence consultants PROJECT: WAGON WHEEL RANCH TANK PROJECT No: CLIENT: SHIMEK, JACOBS & FINKLEA L.L.P. DALLY FIELD REPORT REPORT DATE: HJA JOB No: TECHNICIAN: REVIEWED BY: 6878 BRIEF DESCRIPTION AND LOCATION: WEATHER: /c2'~,7~ y &~,, ~,/ ~ TIME: START WORK: 7 { ~o STOP WORK: DELAYS: ' WORK PERFORMED THE FOLLOWING ITEMS WERE OBSERVED OR CHECKED DURING THIS INSPECTION: (CHECK ( X ) APPROPRIATE RESPONSE - ASTERISK ( * ) REPONSE REQUIRES COMMENT. ) ( ) 1. PIER INSPECTION / FOUNDATION ( ) 10. FIELD DENSITY TESTING ( ) 2. CONCRETE INSPECTION ( z-/d 11. CONCRETE CYLINDER/._ PiCK-uP ( ) 3. SUB-SURFACE DRAIN INSTALLATION ( ) 12. GROUT CUBES ( ) 4. SELECT FILL PLACEMENT ( ) 13. FIELD GRADATION / LIME ( ) 5. LIME STABILIZATION ( ') 14. FIELD REPORTS · ( ) 6. FOOLING INSPECTION ( ) 15. FIELD SAMPLING * ( ) 7. GENERAL INSPECTION * ( ) 16. TENDON / PROOF LOAD INSPECTION ( ) 8. REINFORCEMENT STEEL INSPECTION ( ) 17. PIER INSPECTION / RETENTION ( ) 9. TIE-BACKINSPECTION ( ) 18. SEE ATTACHED SHEETS FOR TEST RESULTS REMARKS: TECHNICIAN: ENGINEER: REPORT No.: telephone (214) 941-3808 fax (214) 943-7645 SHEET / OF / 235 Morgan Ave., Dallas, Texas75203-1025 I I ! I ': -HENLEY · JOHblSTON & ,ASSOCIATES, INC. "engineering geoscience consultants CONCRETE STRENGTH TESTS PROJECT: CONTRACTOR: LOCATION: WAGON WHEEL RANCH TANK LANDMARK STRUCTURES, INC. COPPELL, TEXAS JOB No.: 6878 DATE: SUPPLIER TXI SAMPLE DATA SET 1 SET 2 TRUCK No. TICKET No. TIME BATCHED TIME SAMPLED CONCRETE TEMP. AIR CONTENT SET 1 LOCATION / ZS"..~' IZ i SET 2 LOCATION CYL. No. MIX / I_~__c2,r'_ ., SLUblP .(in_=/ DATE DATE PLACED TESTED MIX DESIGN SET 1 SET2 CEMENT FINE COARSE W/C CONTENT AGGR. AGGR. RATIO (Ibs.] __(Ibs.) __(Ibs.) (gals/sk) TECHNICIAN ENGINEER REPORT No. AGE (_d_.a_y_s) I -7 TOTAL LOAD /9'2fdo REQ'D REQ'D 7 DAY 28 DAY (psi) (psi) SHEET Z OF ~ COMPR. STRENGTH (psi) ADMIX telephone (214) 941-3808 fax (214 943-7645 235 Morgan Ave., Dallas. Texas75203-1025 ! I