Jennifer Armstrong, Finance Director
Kenneth M. Griffin, P.E., Director of Engineering/Public Works
Roadway Impact Fees/All Care Veterinary Clinic
July 21, 1997
On February 25, 1997, a Roadway Impact Fee assessed by the City of Coppell in the amount
of $3908.44 for Service Area 1 was paid by a representative of All Care Veterinary Hospital.
In the past few weeks, the owner has asked the City to review the 1980 Univest Agreement to
determine if the Roadway Impact Fee is applicable on the property he is developing since it is
described in the agreement. Upon review of the Univest Agreement, a determination was made
that this development should not be assessed for Denton Tap Road or Sandy Lake Road.
The Roadway Capital Improvement Plan in the City of Coppell Roadway Improvement Fee
Study indicates that money collected in Service Area 1 could be used to compensate cost or fund
roadway improvements for the following roadways: Parkway Blvd., Denton Tap Road, Coppell
Road and Sandy Lake Road (see attached sheet).
To determine the revised Roadway Impact Fee a percentage was calculated by subtracting out
the total cost in Service Area 1 for all projects concerning Denton Tap Road and Sandy Lake
Road and dividing the remainder by the total cost of all the projects in the service area. By
doing so the calculated percentage is 10.55 %. Therefore the adjusted Roadway Impact Fee for
the referenced project is $3908.44 x .1055 = $412.34.
Please issue a refund check to All Care Veterinary Clinic in the amount of $3496.10.
Thank you for your assistance in this matter and if you should have any questions please feel
free to contact this office.
file/kgriffin/allcare.797
SERVICE
AREA
ROADWAY FROM
Parkway Blvd. Coppell Denton Tap
Denton Tap Rd. Sandy Lake S. Denton CrL
Denton Tap Rd. S. of Denton Crk. SH 121 Bypass
Denton Tap Rd. SH 121 N. City Umits
Coppell Rd. Thweat! Rd. Sandy Lake
Sandy Lake Rd. Coppell Rd. Denton Tap Rd.
* Constructed by Developer
** SERVIC~ AREA 1DTAL e,
~ OF (X)PIq~[. ROADWAY IMPACT FEE STUDY
ROADWAY CAPITAL IMPROVEMENT PLAN
%iN TOTAL VEH-M! VEH- Mi EXCESS
LGNOTH NO. SERVICE PK-HR CAPACITY TOTAL CAPACTrY
(MI) LANES TYPE AREA VOLUME TOTAL DEMAND PK-IIR
PK- HR VEIl- M!
1.10 4 mn 100 158 3080
0.70 6 pa 50 1885 1523
0.50 6 jxt 50 1968 10~8
0.50 6 pa 100 1378 2175
0.40 4 ma 50 519 560
0.7._..J 4 ma 50 ~ 1_0.5_0
3.95 6717 9476
174 2906
1320 203
984 104
689 1486
20~ 352
.6-0? 443
3982 5494
TOTAL
TOTAl. COST IN
COST SF.R VI(T. AR F.A
S I .q 15,841.00 $757,920-~
$ 73~14/o.~'
$5.739.420,50
2 Denton Tap Rd.
Denton Tap Rd.
Sandy Lake Rd.
'* SERVICE AREA TOTAL **
S. of Denton Crk. SH 121 Bypma 0.50
Sandy Lake. & Denton CrK. 0.70
Denton Tap Samuel 1 ..__~
6 128 50 1886 1088 943 145
6 pa 50 1839 1523 1287 235
4 ma 50 52___6 1_~9 _68_4 I1~
4251 4431 2914 1516
S2.460,00000
$1.~1M~41,00 S757.920.50
S4.4~2.'~00 00 S2,226.250.00
$4.214.170.
3 Sandy Lake Rd.
Sandy Like Rd.
Samuel MacArthur 0.70
MacArthur P- (~ty Umi~
4 ma 50 491 980
4 nm 50 67__! 1400
344 6~6
67_3 739
S2.397.'~J0.00 Sl .I 9&7.50.00
S6CO, OO0.OO S 300,000.00
· * SERVIC3~ AREA TOTAL ** 1.70 1162 2380 1015 1365 $ 1.498.750.00