Advantage-CS 870402 PRE-CONSTRUCTION CONFERENCE
PROJECT NAME: /~.~r~.~ ~L~-
DATE : ~/z/~ '~
TIME : ~.'~2~-, AM/PM
ASSIGNED INSPECTOR: ~'~'~ ~/~~
I, ATTENDANCE (SEE ATTACHED LIST)
II, PLANS FURNISHED TO A) CITY YES NO
B) CONTRACTOR YES NO
C) OWNER YES NO
III, UTILITY COMPANIES NOTIFIED:
A) TELEPHONE ~'~ ~2~ /~V8
~"~'~ c) ELECTRIC
D) CABLE T,V,
E) OTHER
IV, STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS:
EASEMENTS YES NO
HIGHWAY PERMIT YES ? NO
RAILROAD PERMIT YES ~ NO
STREET CUT PERMIT YES NO
BORING PERMIT YES NO
V, INSPECTION
A, DAILY INSPECTION BY ASSIGNED INSPECTOR
B, AFTER HOURS AND WEEKENDS (OVERTIME) TO
BE PAID BY THE CONTRACTOR "AT OVERTIME
RATES",
C, CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY
INSPECTOR AT LEAST 24 HOURS BEFORE WATER/
SANITARY SEWER/STORM SEWER/PAVING CONSTRUC-
TION BEGINS,
(2)
VI, TESTING OF MATERIALS
.1, DENSITIES
2, APPROVED CONCRETE BATCH DESIGN
3, CONCRETE PAVING INCLUDING CORES
4, APPROVED ASPHALT BATCH DESIGN
SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR
VII. STREET CLOSING REQUIRED YES ~0
IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND
FIRE DEPARTMENT 72 HOURS IN ADVANCE,
VIII, CONSTRUCTION BARRICADES AND TRAFFIC CONTROL
A, REQUIRED ~YES NO
B, TRAFFIC DETOUR YES ~ NO
C, WARNING LIGHTS YES ~-~'NO
IF STREET DEPARTMENT HAS TO COME OUT TO MOVE BARRICADES
AND/OR REPLACE ANY BARRICADES, THE CONTRACTOR WILL BE
CHARGED FOR THEIR TIME,
IX. AS-BUILT PLANS
CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR
SUBMITTING THE CORRECT "AS-BUILT" PLANS TO THE CITY
X, INFORMATION
DEVELOPER: NAME i./~?~ ?/~? ~-
ADDRESS ~/C'~ l~l( ft/7//f? //~'~ '~ ~t~- ~lt~
PHONE c~ ~'~ __ ~ ~/ )
PROJECT MANAGER ~--{C'~-;; ~XO
CONSULTING ~c-
ENGINEER: NAME , ~_cc - ~.~,~ y~) /~,~: ~,,
ADDRESS ~0~ O.-m~/~E~-,~ ~,- ~((~S
PHONE ~?{ - '2{ ~ ~
PROJECT EN6INEER ~0/~o ~ c.
(3)
GENERAL · - , ·
CONTRACTOR: NAME /,/' 4Z
/-.
ADDRESS ~¢ ~
~/~ ~
PHONE
SUPERINTENDENT
EXCAVATING
CONTRACTOR: NAME
ADDRESS
PHONE
SUPERINTENDENT
PAV I NG
CONTRACTOR:
PHONE ~ k -
SUP.R NT.N .NT
~llkllY ....
CONTRACTOR: NAME [~2~1¢[~('
ADDRESS i~ L; c~
PHONE ~ ~ i-
SUPERINTENDENT
X, GENERAL {-] DATE
AS-BUiLT DRAWINGS - UTiLiTiES
1- MYLAR 3- BLUE LINES
AS-BUiLT DRAWINGS - PAVING, DRAI~IAGE
].- MYLAR z_~ BLUE LINES
MAINTENANCE BOND - UTiLiTiES
MAINTENANCE 'BOND - PAVING, DRAINAGE
PRO-RATA WORK SHEET COMPLETED
PRO-RATA PAiD
WATER & SEWER FINALED
PAVING & DRAINAGE FINALED
TIME ~'-
ATTENDANCE SHEET
NAME COMPANY PHONE