Adams-CS 880628PUBLIC WORKS CITY OF COPPELL P.O. BOX 478 COPPELL, TEXAS 75019 LAW OFFICES OF JACK GAY ATTORNEY AT LAW June 28, 1988 Att: STEVE GORAM Gentlemen: Re: John Adams Drainage Easement Coppell, Texas Your presents at the meeting of May 24, 1988 was appreciated and we trust that you have had time to review the drainage matter since that date. At the meeting you seemed to take a position that the city has no liability to Mr. Adams. It is my theory that the city has an obligation to all landowners regarding drainage. The Indemnity agreement represents only a part of your responsibility. In your case the city would seem to have a dual responsibility in that the city has been appointed to provide comprehensive management of the floodplains in the city. At the meeting, all parties were given until September 15, 1988 in order to take some positive action toward a satisfactory resolution of the matter. In the event the matter is not resolved to the satisfaction of Mr. Adams by that date, a suit will be filed on the 16th with the city as a party. if you desire to avoid the.litigation, you should kava ample time to take action by the 15th of September. If you have any suggestions or desire to discuss the matter in more detail, please give me a call. Verily yours, Copies to: LAWRENCE JACKSON ATTORNEY, CITY OF COPPELL 1800 LINCOLN PLAZA DALLAS, TEXAS 75201 23 MAY 1988 ESTIMATED coST FOR THE CONSTRUCTION OF 96-INCH REINFORCED CONCRETE PIPE FROM 159 FEET NORTH OF COPPELL ROAD AT STATE HIGIIWAY 121 TO DENTON CREEK. Ail work itcms are as estimated without the aid of soil boring, therefore some items may not be shown and others may not be required. ITEM QUANT].TY UNIT PRICE COST ]. Remove conc headwall and apron 2. Remove 48-inch RC Pipe Culvert 3. Remove and replace fence 4. Remove and salvage 96-inch RC Pipe 5. For 96-inch R.C. Pipe complete in place 6. Reinforced concrete for pipe headwall 7. Rock for pipe embedment 8. Compacted backfill (using surplus exc.) 1 ea LS 1,200 24 LF LS 500 155 LF 6.55 1,015 42 LF LS 1,500 544 LF 275.00 149,600 12.5 CY 369.00 4,612 553 CY 30.00 16,590 145 CY 3.00 435 10% Contingency $175,452 17,545 Estimated Engineering Fee for the approved design of the Project: 10%.x Est. Constr. Cost ($192,997)= $192,997 19,300 TOTAL ESTIMATED COST: $212,297