Alford Media-CS 971031The City With A Beautiful Future
Tom Alford
Alford Media
12901 Hutton Drive
Dallas, TX 75234
Alford Media Addtion
Development Fee Assessment
P.O. Box 478
Coppell, Texas 75019
214-462-0022
October 31, 1997
Dear Mr Alford:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Copper in the amount of $35,087.83 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful begivning of this project. We look forward
to working with you on this project. If you have any questions, please contact me.
Since~2~.~, ' -,
~Ith M. Grid. E.
DirecWr of Public Works/City Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
DEVELOPMENT FEE TABLE
Project:
Date:
Alford Media Addition
10/31/97
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $8,325.00 $8,325.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $150.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $195.98
(100 % due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $1,690.13
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $70.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $3,600.00 $3,600.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Buildin~ Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $23,162.83 $23,162.83
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
developme~, t contracts
TOTAL $37,323.94
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $35,087.83
DEVELOPMENT FEE WORKSHEET
PROJECT: A~ford Medi~ Addi~n
DATE: 10/31/~7
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
I - 2 inch 8 ESU's
I - 2 inch 8 ESU's
ESU's
I - 6 inch 2.5 ESU's
Fireline Meter(s):
Total #: 18.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 1 Domestic Meter(s) @ $195.98
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter(s) @
Total #: 0 Additional Irrigation Meter(s) @
Total #: I Fireline Meter(s) @
(10096 due prior to issuance of water meters)
$195.98
$1,494.15
Water Meter Deposit Fee (Domestic):
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 2 Meter(s) @ $35.00 ea.
(10096 due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
8
$450.00 ea.
Wastewater Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (AH developments):
Total #: I Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
$8,325.00
, $150.00
$195.98
$195.98
$0.00
$1,494.15
$30.00
$70.00
$3,600.00
$50.00
$50.00.
Park Fee (For Resdential Developments Only): Page I
T
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
2 calculations performed:
(1) 1,435 S.F. office
(2) 29,796 S.F. for warehouse/demo room
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
N/A
$23,162.83
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
available at tJtis ~
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Need submittal of
development contracts
Page 2
AIRWAY ~
RO IMPACT FEE CALCULATIONS
PROJECT: Alford Media A~_'_~on
DATE: 10/31/97
ROADWAY IMPACT FEE:
Service Area *
Category **
Land Use **
Building Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Developmen~ Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
4
Office
General Office Buildin~
11,435
11.435
3.~
$13,687.70
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
RO AY IMPACT FEE CALCULATIONS
PROJECT: A/ford Med/a Add/t/on
DATE: 10/$1/97
ROADWAY IMPACT FEE:
Service Area *
Category **
Land Use **
e~di~ S~ (ScI. ~t.)
Develol~nent Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Developmeni Units) x
(Vehicle Miles per DeveloplnenI Uni0 x (Fee per Vehicle Mile) =
4
General Light Industrial
29,796
29.796
$9,475.13
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)