Loading...
Alford Media-CS 971031The City With A Beautiful Future Tom Alford Alford Media 12901 Hutton Drive Dallas, TX 75234 Alford Media Addtion Development Fee Assessment P.O. Box 478 Coppell, Texas 75019 214-462-0022 October 31, 1997 Dear Mr Alford: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Copper in the amount of $35,087.83 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful begivning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Since~2~.~, ' -, ~Ith M. Grid. E. DirecWr of Public Works/City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Date: Alford Media Addition 10/31/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $8,325.00 $8,325.00 (100% due prior to Council Approval) Water Tap Inspection Fee $150.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $195.98 (100 % due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $1,690.13 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $70.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $3,600.00 $3,600.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Buildin~ Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $23,162.83 $23,162.83 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of developme~, t contracts TOTAL $37,323.94 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $35,087.83 DEVELOPMENT FEE WORKSHEET PROJECT: A~ford Medi~ Addi~n DATE: 10/31/~7 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): I - 2 inch 8 ESU's I - 2 inch 8 ESU's ESU's I - 6 inch 2.5 ESU's Fireline Meter(s): Total #: 18.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 1 Domestic Meter(s) @ $195.98 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: 1 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: I Fireline Meter(s) @ (10096 due prior to issuance of water meters) $195.98 $1,494.15 Water Meter Deposit Fee (Domestic): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 2 Meter(s) @ $35.00 ea. (10096 due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 8 $450.00 ea. Wastewater Tap Inspection Fee: Total #: I Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (AH developments): Total #: I Lots @ $50.00 ea. (100% due prior to issuance of building permit) $8,325.00 , $150.00 $195.98 $195.98 $0.00 $1,494.15 $30.00 $70.00 $3,600.00 $50.00 $50.00. Park Fee (For Resdential Developments Only): Page I T DEVELOPMENT FEE WORKSHEET * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: 2 calculations performed: (1) 1,435 S.F. office (2) 29,796 S.F. for warehouse/demo room (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A N/A $23,162.83 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) available at tJtis ~ Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Need submittal of development contracts Page 2 AIRWAY ~ RO IMPACT FEE CALCULATIONS PROJECT: Alford Media A~_'_~on DATE: 10/31/97 ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** Building Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Developmen~ Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = 4 Office General Office Buildin~ 11,435 11.435 3.~ $13,687.70 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) RO AY IMPACT FEE CALCULATIONS PROJECT: A/ford Med/a Add/t/on DATE: 10/$1/97 ROADWAY IMPACT FEE: Service Area * Category ** Land Use ** e~di~ S~ (ScI. ~t.) Develol~nent Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Roadway Impact Fee due = (Developmeni Units) x (Vehicle Miles per DeveloplnenI Uni0 x (Fee per Vehicle Mile) = 4 General Light Industrial 29,796 29.796 $9,475.13 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)