Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Asbury Manor-LR 971216
FUGRO-McCLELLAND (SOUTHWEST), INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Ryland Homes Report Date: December 16, 1997 PROJECT: Asbury Manor, Coppell, Texas Project No.: 0771-2111 SAMPLE DATE: November 17, 1997 CONTRACTOR: M.B. Structures TICKET NO.: 323818 CONCRETE SUPPLIER: Redi-Mix AMBIENT TEMP. (°F): 40 PLANT/TRUCK: CONCRETE TEMP. (°F) (ASTM C-1064): 65 MIX ID NUMBER: 5 TIME BATCHED: 12:05 pm AIR (%) {ASTM C-231): TIME SAMPLED: 1:15 pm WATER ADDED (gal): 10 WEATHER CONDITION: Cloudy/cool SLUMP (in.) (ASTM C-143): 5.0 LOCATION OF PLACEMENT: South Wing Wall on 3 barrel box culvert -CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) AMC 17 7 11/24/97 107000 3784 3000/28 days AMC 18 28 12/15/97 130000 4598 AMC 19 28 12/15/97 135000 4775 Fracture mode is (A) unless otherwise noted Specifications: Making& ASTM C-31 Testing ASTM C-143, Typesof ~] [~] ~ [~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Ted Nicholas FUGRO-McCLELLAND (SOUTHWEST), INC. Checked By:d------ SMH/rm Distribution: Ryland Homes - Fred Phillips Goodwin & Marshall- Matt Goodwin City of Coppell - Garreth Campbell City of Coppell- Larry Davis --