Loading...
Asbury Manor-LR 971201FUGRO-McCLELLAND (SOUTHWEST), INC. - 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Ryland Homes Report Date: December 1, 1997 PROJECT: Asbury Manor, Coppell, Texas Project No.: 0771-2111 .. : SAMPLE' DATE: November 19,-.1997 CONTRACTOR: M.B. Structures TICKET NO.: CONCRETE SUPPLIER: Redi Mix AMBIENT TEMP. (°F): PLANT/TRUCK: CONCRETE TEMP. (°F) (ASTM C-1064).' MIX ID NUMBER: TIME BATCHED: AIR (%) (ASTM C-231) -' TIME SAMPLED: WATER ADDED (gal): WEATHER CONDITION: Partly Cloudy SLUMP (in.) (ASTM C-143) LOCATION OF PLACEMENT: Outflow deck of box culvert CONCRETE-CYLINDER iCOMPRESSIVE STRENGTH-TESTS -' Standard 6,, x 12",~28~2T square inches '- . TOTAL COMPRESSIVE REQUIRED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) AMC 23 7 11-26-97 127000 4492 3000/28 days AMC 24 28 12-17-97 AMC 25 28 12-17-97 AMC 26 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM 0-143, Typesof [~ [~[~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Cylinders cast by Contractor. All information except test data furnished by Contractor and assumed to be correct. Technician: Skip Martin FUGRO-McCLELLAND (SOUTHWEST), INC. Checked B~"- / SMH/hb Distribution: Ryland Homes - Fred Phillips Goodwin & Marshall - Matt Goodwin City of Coppell - Garreth Campbell ~ City of Coppell - Larry Davis Legends Construction - Jimmy Henderson