Ashton Ridge-LR 961008ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
DAILY FIELD REPORT
TESTED FOR
M & M DEVELOPMENT, INC.
C/O FINLEY DEVELOPMENT
DATE
10/08/96
PROJECT
ASHTON RIDGE
COPPELL, TEY~AS
OUR REPORT NO.
96362-37
WEATHER: CLOUDY
TEMPERATURE RANGE: 6 3
ALPHA Representative: S · A.
TO:
67
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED
TO MONITOR ON-GOING WORK ;%ND PERFORM FIELD TESTING AS REQUESTED.
SUBGRADE FOR LOTS 1 THROUGH 7 WAS OBSERVED TO ASSURE THAT ALL CEMENT
STABILIZED MATERIAL HAD BEEN PROPERLY REMOVED. UPON OBSERVATION, LOTS 1
THROUGH 5 WERE FOUND WITH EVIDENCE OF CEMENT STABILIZED MATERIAL STILL IN
PLACE. SUBGRADE AT LOTS 6 AND 7 APPEARED TO HAVE ALL CEMENT STABILIZED
MATERIAL COMPLETELY REMOVED.
SITE SUPERINTENDENT WAS INFOP~%IED OF i~_LL OBSERVATIONS i~ND FIELD TEST
RESULTS.
AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE
DALLAS OFFICE.
ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
DAILY FIELD REPORT
TESTED FOR
M & M DEVELOPMENT, INC.
C/O FINLEY DEVELOPMENT
DATE
10/08/96
PROJECT
ASHTON RIDGE
COPPELL, TEXAS
OUR REPORT NO.
96362-38
WEATHER: CLEAR
TEMPERATURE RANGE: 7 4
ALPHA RepreSentative: S · A.
TO: 79
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED
TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
SUBGRADE FOR PADS t THROUGH 7 WERE OBSERVED TO ASSURE THAT ALL CEMENT
STABILIZED MATERIAL HAD BEEN PROPERLY REMOVED. UPON OBSERVATION CLIENT
REPRESENTATIVE ANDTECHNICIANDETERMINED THAT REMOVAL OF CEMENT STABILIZED
MATERIAL HAD BEEN ADEQUATE PERFORMED.
LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ABOVE WILL FOLLOW
ON A SEPARATE REPORT.
BOB FINLEY WAS INFORMED OF ALL OBSERVATIONS A/~D FIELD TEST RESULTS.
AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE
DALLAS OFFICE.