Ashton Ridge-LR 961007ALPHA TESTING, INC.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229
(214) 620-8911
DALLY FIELD REPORT
TESTED FOR
M & M DEVELOPMENT, INC.
C/O FINLEY DEVELOPMENT
DATE
10/07/96
PROJECT
ASHTON RIDGE
COPPELL, TEXAS
OUR REPORT NO.
96362-36
WEATHER: FAIR
TEMPERATURE RANGE: 7 9
ALPHA RepreSentative: S. A ·
TO: 82
THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED
TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED.
SUBGRADE FOR LOTS' 1 THROUGH 7 WAS OBSERVED TO ASSURE THAT ALL CEMENT
STABILIZED SOIL HAD BEEN PROPERLY REMOVED. AFTER OBSERVING SITE, IT
APPEARED THAT CEMENT STABILIZED MATERIAL STILL EXISTS ON LOTS 1 THROUGH
5, ALONG SOUTH PORTION OF LOTS. SITE WILL BE OBSERVED AGAIN ON 10/08/96.
AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE
Di~JuI_J~S OFFICE.