Loading...
Ashton Ridge-LR 961005ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DAILY FIELD REPORT TESTED FOR M & M DElrELOPMENT, INC. C/O FINLEY DEVELOPMENT DATE 10/05/96 PROJECT ASHTON RIDGE COPPELL, TEXAS OUR REPORT NO. 96362-35 WEATHER: OVERCAST TEMPERATURE RANGE: 60 ALPHA Representative: K. N, TO: 7 0 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. SUBGRADE FOR HOUSE PADS WAS OBSERVED TO ASSURE THAT ALL CEMENT STABILIZED SOIL HAD BEEN PROPERLY REMOVED. WHEN CHECKED FOR PRESENCE OF CEMENT, SMALL AMOUNTS OF CEMENT WERE NOTED IN THE FRONT YARDS OF LOTS 3, 4, & 5. AN AREA APPROXIMATELY 20' BY 20' OF CEMENT MATERIAL WAS NOTED ON LOT 2. REMOVAL OF CEMENT MATERIAL FROM LOTS 2, 3, 4, & 5 WILL BE COMPLETED ON MONDAY, 10/07/96. MATEO WITH XIT PAVING WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. Respect~l~ubmitted//~---PA"T-.' STETTNER A L P HA E SkT.._~ G,-4N~. ~.. _