Loading...
WA9601-CS 981009 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L./ACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. soE R. CART~R, P.E. October 9, 1998 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E, Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch Elevated Storage Tank Maintenance Bond for Change Order Numbers 1 and 2 Dear Mr. Griffin: In Pay Request Number 3 for the Wagon Wheel Ranch Elevated Storage Tank, Change Order Numbers 1 and 2 were fully complete, accepted by the City of Coppell and the retainage was reduced to 0% for this work. We are enclosing the two year maintenance bond submitted by Landmark Structures, Inc. for Change Order Number 1 and 2 to the Wagon Wheel Ranch Elevated Storage Tank. This copy is for your files. We are available to discuss this project further at you convenience. Sincer y yo , Enclosure / cc: Mr. Larry Davis j:\coppell\96-149\letters\constXmaintancdoc SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, ~820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L JACOBS, P.E. RONALD V CONWAY, P.E. JOHN W. BIRKHOFF, P.E JOE g. CARTER, PE October 7, 1998 GARY C HENDRICKS, PE. 1. C. FINKLEA, P.E. Mr. Joe Swinnea Landmar ructures, Inc. 1665 rmon Road Re: City of Coppell Wagon Wheel Ranch Elevated Storage Tank Change Order No. 4 Dear Mr. Swinnea: We are enclosing five copies of Change Order Number 4 to your contract with the City of Coppe!l, for the construction of the Wagon Wheel Ranch Elevated Storage Tank. Change Order Number 4 provides for that extra work required for the alignment revisions to Northpoint Drive, valve and motor operator revisions at the Wagon Wheel Ranch and existing elevated tanks and backfill compaction testing for the portion of the Sandy Lake Road water line constructed under change order number one. If this change order is acceptable, please sign and return all five copies to this office. Sincer Paul A. Carline, E.I.T. Enclosure / cc: Mr. Kenneth Griffin, P.E. Mr. Larry Davis \x~jt~sjLvo12\projects\clerical\coppell\96-149\letterskonst\co 4ltrdoc SHIM EK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L JACOBS, P.E. RONALD V. CON~/AY, P.E. JOHN W BIRKHOFF, P.E JoE R. C~.XTER, P.E. October 6, 1998 GARY C. HENDR1CKS, P.E. 1. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City Engineer/Assistant City Manager City of Coppell Post Office Box 478 Coppe!l, Texas 75019 Re: Wagon Wheel Ranch Elevated Storage Tank Dear Mr. Griffin: As you requested, we have re-aligned the Northpoint Drive Extension associated with the construction of the Wagon Wheel Ranch Elevated Storage Tank and have modified the construction plan sheets affected by this change. Northpoint Drive now is configured to extend due east along the north property line of the Wagon Wheel Ranch Park. We are enclosing two copies of the revised construction plans for your review and comment. The Northpoint Drive modification, along with the revisions to the control valves at both elevated tanks as we discussed on Wednesday, September 30, 1998, is included with the revised construction plans. If the revisions meet with your approval, we will forward five sets of the revised plans in the form of a change order to Landmark Structures, Inc. for execution. We are available to discuss this project further at your convenience. Enclosure ' ~' ' ' \\sjfxsj~vol2\proj ects\clerical\coppellN96-149\letters\const\ch _41tr doc