Loading...
Ashton Ridge-LR 960815ALPHA TESTING, I~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. DATE: 8/15/96 LEWISVILLE, TEXAS PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. 96362-11-A COPPELL, TEXAS TEST DATA: I TEST I DATE I E'EV.I SOIL ID mmMUM MAXIMUM LAI! IN Iq. AC~ IN Iq. ACE PERCENT MOI~RJRE DRY ~ MO~TURE DRY DENMrY coae~Acl~oN COMMENT* I INO' I DEPTN~'~I NUMBER % ' PCF % PCF 75 08/15/96 FG - 4.0 1 12.5 111.0 13.2 110 99 1-A 76 08/15/96 FG - 2.0 2 13.1 114.9 13.7 114 99 1-A TEST LOCATION: 75 SANITARY SEWER BACKFILL LINE "A" AT STA: 3 + 35 76 SANITARY SEWER BACKFILL LINE "A" AT STA: 3 + 40 1.FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED CQ0108~,1t A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING,/~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. DATE: 8/15/96 LEWISVILLE, TEXAS PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. 96362-11 COPPELL, TEXAS TEST DATA: ~ DRY ~ MOISTURE DRY DENmTY COMPACTmN COMMENT* NO. DATE NUMBER % Fr.F % FCF 68 08/15/96 FG- 10.0 2 13.1 114.9 13.5 112 98 1-A 69 08/15/96 FG - 8.0 1 12.5 111.0 14.6 108 97 1-A 70 08/15/96 FG- 6.0 2 13.1 114.9 13.1 113 99 1-A 71 08/15/96 FG - 8.0 2 13.1 114.9 14.1 110 96 1-A 72 08/15/96 FG - 6.0 2 13.1 114.9 13.9 112 98 1-A 73 08/15/96 FG - 8.0 1 12.5 111.0 13.7 110 99 1-A TEST LOCATION: 68 SANITARY SEWER BACKFILL LINE "A" AT STA: 1 + 40 69 SANITARY SEWER BACKFILL LINE "A" AT STA: 1 + 45 70 SANITARY SEWER BACKFILL LINE "A" AT STA: 1 + 50 71 SANITARY SEWER BACKFILL LINE "A" AT STA: 1 + 55 72 SANITARY SEWER BACKFILL LINE "A" AT STA: 1 + 60 73 SANITARY SEWER BACKFILL LINE "A" AT STA: 3 + 25 74 SANITARY SEWER BACKFILL LINE "A" AT STA: 3 + 30 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED Ao TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST