Loading...
Ashton Ridge-LR 960808ALPHA TESTING, I~C. 2209 wisconsin st., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. DATE: LEWISVILLE, TEXAS 8/8/96 PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. 96362-9 COPPELL, TEXAS TEST DATA: TEST ~. I SOILID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE~ I NUMBER MOISTURE% DRY PcFDENSITY MOISTURE% DRY pcFDENSITY COMPACTION COMMENT* 52 08/08/96 FG 2 13.1 114.9 15.5 114 100 1-A 53 08/08/96 SG + 1.6 1 12.5 111.0 15.2 108 97 1-A 54 08/08/96 FG 2 13.1 114.9 13.2 112 97 1-A 55 08/08/96 FG 2 13.1 114.9 14.7 110 96 1-A 56 08/08/96 FG 2 13.1 114.9 '15.2 112 98 1-A 57 08/08/96 FG 2 13.1 114.9 16.0 110 96 1-A 58 08/08/96 SG + 4.0 2 13.1 114.9 13.6 112 97 1-A TEST LOCATION: NO BLOCK DESIGNATION: 52 PAD 14 53 PAD 16 54 PAD 16 55 PAD 17 56 PAD 18 57 PAD 20 58 PAD 22 1. FILL 2. NATURAL SUBGRADE 3. LIME STABIMZED 4. CEMENT TREATED CQ010&3-1a A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, I~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. LEWISVILLE, TEXAS DATE: 818196 PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION COPPELL, TEXAS OUR REPORT NO. 96362-9-A TEST DATA: I TEST I DATE I~' SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO. NUMBER % PCF % PCF 52 08/08/96 FG 2 13.1 114.9 13.1 112 98 1-A 53 08/08/96 FG 2 13.1 114.9 14.4 110 96 1-A 54 08/08/96 SG + 1.6 2 13.1 114.9 14.0 111 96 1-A 55 08/08/96 FG 2 13.1 114.9 13.3 114 99 1-A 56 08/08/96 SG + 1.6 1 12.5 111.0 ' 12.9 109 98 1-A 57 08/08/96 SG + 2.4 2 13.1 114.9 17.1 103 90 1-BC 58 08/08/96 FG 2 13.1 114.9 14.7 112 97 1-A TEST LOCATION: NO BLOCK DESIGNATION PLANS: 52 PAD 22 53 PAD 23 54 PAD 25 55 PAD 25 56 PAD 26 57 PAD 26 58 PAD 26 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CQ010~3-18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, I~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. DATE: LEWISVILLE, TEXAS 818196 PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. COPPELL, TEXAS 96362-9-B TEST DATA: TEST ~ SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY OeNsr~ UO~S'rURE DRY DENSn'Y COUPACT~O. COMMENT* NO. DATE NUMBER % PCF % ~CF 66 08/08/96 FG 2 13.1 114.9 15.6 111 97 1-A 67 08/08/96 SG + 2.4 2 13.1 114.9 15.2 110 96 1-AD TEST LOCATION: NO BLOCK DESIGNATION PLANS: 66 PAD 27 67 RETEST OF TEST NO. 64 OF THIS REPORT 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST