Loading...
Ashton Ridge-LR 960806ALPHA TESTING, h~'. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 REPORT OF FIELD COMPACTION TESTS (214) 620-8911 TESTED FOR: MONEYLINE CONSTRUCTION CORP. LEWISVILLE, TEXAS DATE: 8/6/96 PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION COPPELL, TEXAS OUR REPORT NO. 96362-7 TEST DATA: I TEST ] DATE r~LEV' SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PF. RCEHT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO. /DEPTH ~ NUMBER % PCF % PCF 29 08/06/96 FG 2 13.1 114.9 15.7 112 98 1-A 30 08/06/96 FG 2 13.1 114.9 15.9 112 97 1-A 31 08/06/96 SG + 1.6 1 12.5 111.0 13.9 109 98 1-A 32 08/06/96 SG + 2.4 2 13.1 114.9 14.7 116 101 1-A 33 08106/96 FG 2 13.1 114.9 - 15.0 112 98 1-A 34 08/06/96 SG + 2.4 2 13.1 114.9 16.1 110 96 1-A 35 08/06/96 SG + 3.2 2 13.1 114.9 14.1 111 96 1-A TEST LOCATION: NO BLOCK 29 PAD 1 30 PAD 2 31 PAD 3 32 PAD 4 33 PAD 5 34 PAD 6 35 PAD 7 ~mi/ ALPHA TESTINGS- 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CQ010~8-18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, h~'. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYL I NE CONSTRUCT I ON DATE: AUGUST 6, 1996 LEWISVlLLE, TEXAS PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. 96362 COPPELL, TEXAS TEST DATA: TEST ] DATE [ ~ ELEV. SOIL ID OP~MUM MAXIMUM ~B IN Pr. ACE IN P~CE PERCENT NO.I /DEPT~_ NUMBER MO~TURE% DRYPcFDENS~ MOISTURE% DRY~FDENSITY COMPACTION COMMENT 1 08/06 EG-1 2 13.1 114.9 9.0 114 99 2 08/06 EG-2 2 13.1 114.9 11.0 113 98 3 08/06 EG-1.5 2 13.! 114.9 12.4 111 97 4 08/06 EG 2 13.1 114.9 11.2 112 97 TEST LOCATION: F ILL TO 3.25' 1 TEST PIT 1, EXCAVATION 2 TEST PIT 1, EXCAVATION 3 TEST PIT'i, BACKFILL 4 TEST PIT 1, BACKFILL R./~esp~ffully Submitted----/ 1.FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED CE1010~18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, h~. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: PIONEYL I NE CONSTRUCT I ON DATE: AUGUST 6, 1996 LEWlSVlLLE, TEXAS 7.2 ACRE RESIDENTIAL SUBDIVISION 96362 PR~ECT: OUR REPORT NO. COPPELL, TEXAS TEST DATA: TEST DATE '~'~,,,,.~LEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO.DEPTH ~.~,~ NUMBER % PCF % PCF 1 08/06 EG I & 2 12 . 5 I I I . 0 13 . 0 107 96 TEST LOCATION: F ILL TO 1 o 0' 1 TEST PIT 2 ~ BACKFILL 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED (~10108~18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, I~. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: HONEYLINE CONSTRUCTION DATE: AUGUST 6, 1996 LEWlSVlLLE, TEXAS PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION 96362 COPPELL, TEXAS OURREPORTNO. TEST DATA: TEST I DATE r ~LEV. SOIL ID oP'nMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO.J /DEPTH ~ NUMBER % ;=CF % PCF 1 08/06 EG 2 13. I 114.9 11 . 2 113 98 TEST LOCATION: NO F ILL I TEST PIT 3 BACKFILL s~~ully Submi~,~ 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CQ010~.18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, I~[~. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR: PIONEYLINE CONSTRUCTION DATE: AUGUST 6, 1996 LEWlSVILLE, TEXAS PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OURREPORTNO. 96362 COPPELL, TEXAS TEST DATA: TEST I DATE [ ~LEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO.~ /DEPTH ~ NUMBER % PCF % PCF 1 08/06 EG 1 1 2.5 1 1 1 . 0 1 2 · 9 1 07 97 TEST LOCATION: NO F ILL 1 TEST PIT 4~ ~BACKFILL 1.FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CQ0108~.18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST 0 100 200 t GRAPHIC SCALE IN FEET ROI~¥-LINE CONSTRUCTION CORP. ADDISON, TEXAS 7.2-ACRE RESIDENTZAL SUBDIVZSION COPPET.T., TEXAS T~ST PIT LOCATION PT~AN FIB - 1 96362 8-6-96 ALPHA TESTING, I~'. 2209 wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. DATE: LEWISVILLE, TEXAS 8/6/96 PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. COPPELL, TEXAS 96362-7-A TEST DATA: I [ ~ OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT TEST DATE ~LEV. SOIL ID COMMENT* MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION NO. /DEPTH --~, NUMBER % PCF % PCF 36 08/06/96 FG 2 13.1 114.9 15.1 111 97 1-A 37 08106/96 SG + 3.2 2 13.1 114.9 16.1 110 96 1-A 38 08/06/96 SG + 2.4 2 13.1 114.9 13.9 112 98 1-A 39 08/06/96 SG + 3.2 2 13.1 114.9 14.9 112 97 1-A 40 08/06/96 FG 2 13.1 114.9 -13.2 114 99 1-A TEST LOCATION: NO BLOCK 36 PAD 8 37 PAD 9 38 PAD 10 39 PAD 11 40 PAD 12 1.FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED C0010~-18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST