Ashton Ridge-LR 960806 (2)ALPHA TESTING,~'~C.
2209 Wisconsin St., Suite 100
Dallas, Texas 75229 ·
(214) 620-8911
DAILY FIELD REPORT
TESTED FOR
MONEYLINE CONSTRUCTION
LEWlSVILLE, TEXAS
DATE
AUGUST 6, 1996
PROJECT
7.2 ACRE RESIDENTIAL SUBDVSN
COPPELL, TEXAS
OUR REPORT NO. 9 6 3 6 2
WEATHER:
CLEAR
TEMPERATURE RANGE:
ALPHA Representative:
80
J. BURA
DATE:
TO:
100
THE ALPHA TECHNICIAN TRAVELED TO THE PROJECT SITE AS REQUESTED TO PERFORM
FIELD DENSITY TESTING IN ASSOCIATION WITH SUBSURFACE FILL ANALYSIS (TEST
PITS). FOUR TEST PITS WERE EXCAVATED, EVALUATED, TESTED, SAMPLED, AND
BACKFILLED IN THE VICINITY OF BORING 6.
A TOTAL OF 7 FIELD DENSITY TESTS WERE PERFORMED ON FILL SOILS FOR THE TEST
PIT. REFERENCE ATTACHED PLAN FOR TEST PIT LOCATION.
THE ALPHA ENGINEER WAS INFORMED OF ALL OBSERVATIONS AND TEST RESULTS.
TECHNICIAN RETURNED TO THE LABORATORY.