Loading...
Ashton Ridge-LR 960802ALPHA TESTING, I~'. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. DATE: 8/2/96 LEWISVILLE, TEXAS PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. 96362-5 COPPELL, TEXAS TEST DATA: TEST r~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT T~ MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPAC'nON COMMENT* NO. DATE /DEP NUMBER % PCF % PCF 11 08/02/96 SG 1 12.5 111.0 13.8 106 95 2-A 12 08/02/96 SG I 12.5 111.0 14.3 107 96 2-A 13 08/02/96 SG 1 12.5 111.0 13.0 108 98 2-A 14 08/02/96 SG 1 12.5 111.0 14.1 106 95 2-A 15 08/02/96 SG + 0.5 2 13.1 114.9 ' 13.9 114 99 1-A 16 08/02/96 SG + 1.0 2 13.1 114.9 14.6 113 98 1-A 17 08/02/96 SG + 0.5 2 13.1 114.9 15.0 111 96 1-A TEST LOCATION: NO BLOCK 11 PAD 1 12 PAD 3 13 PAD 5 14 PAD 7 15 PAD 24 16 PAD 23 17 PAD 26 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENTTREATED CQ010~-18 A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, I~. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION CORP. DATE: 8/2/96 LEWISVILLE, TEXAS PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. 96362-5-A COPPELL, TEXAS TEST DATA: TEST DATE/ EPT" ~[D~ SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO. NUMBER % PCF % PCF 18 08/02/96 SG + 1.0 2 13.1 114.9 16.0 111 96 1-A TEST LOCATION: NO BLOCK 18 PAD 27 1. FILL 2. NATURALSUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CEi010~3-18 A. TEST RESUL'FSCOMPLYWITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, I~C. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION, CORP. LEWISVILLE, TEXAS DATE: 8/2/96 PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION COPPELL, TEXAS OUR REPORTNO. 96362-4-A TEST DATA: TEST DATE SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO. NUMBER % PCF % PCF 1 08/02/96 SG 1 12.5 111.0 14.4 106 95 2-A 2 08/02/96 SG 1 12.5 111.0 14.0 107 97 2-A 3 08/02/96 SG 1 12.5 111.0 13.4 109 98 2-A 4 08/02/96 SG 1 12.5 111.0 12.8 110 100 2-A 5 08/02/96 SG 1 12.5 111.0 .... 13.9 107 97 2-A 6 08/02/96 SG 1 12.5 111.0 12.5 109 98 2-A 7 08/02/96 SG 1 12.5 111.0 14.5 107 97 2-A TEST LOCATION: NO BLOCK DESIGNATION (ONLY 1 BLOCK): 1 PAD 27 2 PAD 25 3 PAD 23 4 PAD 21 5 PAD 19 6 PAD 17 7 PAD 15 (~~JJD ~ ~~JE/ALPHA TESTING' I~O~ '/ R 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, I~. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR: MONEYLINE CONSTRUCTION, CORP. DATE: LEWISVILLE, TEXAS 8/2/96 PROJECT: 7.2 ACRE RESIDENTIAL SUBDIVISION OUR REPORT NO. COPPELL, TEXAS TEST DATA: TESTI DATE ID~ SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* NO, NUMBER % PCF % PCF 8 08/02/96 SG 1 12.5 111.0 14.2 107 96 2-A 9 08/02/96 SG 1 12.5 111.0 13.4 107 96 ~ 2-A 10 08/02/96 SG 1 12.5 111.0 13.9 107 97 2-A TEST LOCATION: NO BLOCK DESIGNATION (ONLY 1 BLOCK): 8 PAD 13 9 PAD 11 10 PAD 9 1.FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED A. TEST RESULTS COMPLY WITH SPECIFICATIONS B. COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST