Loading...
WA9601-CS 980928 SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. September 28, 1998 GARY C. HENDRICKS, P.E. I. C, FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch 2.0 MG Elevated Storage Tank Bid NO. Q 0198-03 Dear Mr. Griffin: We are enclosing three (3) copies of Pay Request No. 4 in the amount of $271,348.50 for work performed by Landmark Structures, Inc., on the Wagon Wheel Ranch 2.0 MG Elevated Storage Tank project, from September 1, 1998 through September 28, 1998. This project is approximately 44% complete. If you concur with this Pay Request, please have it executed for the City of Coppell and forward one copy along with the payment due to Landmark Structures, Inc. Enclosures cc: Mr. Larry Davis Landmark Structures, Inc. j:\clerlcal\coppell\96-149\pay-rqst\ltr-4.doc SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L JACOBS, P.E RONALD V. CONWAY, P.E JOHN W BIRKHOFF, P.E. JoE vt. CARTER, PE. September 15, 1998 GARY C, HENDRICKS, PE. 1. C FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Sandy Lake Road Water Line Change Order Number 3 Dear Mr. Griffin: We are enclosing five copies of Change Order Number 3 to your contract with Landmark Structures, Inc. for the construction of the Wagon Wheel Ranch Elevated Storage Tank. Change Order Number 3 provides for that extra work required to substitute a free span complete storage floor consisting of a concrete deck and wall mounted l-ton jib crane in place of the partial galvanized steel storage floor and supports and 1/2-ton capacity free standing jib crane. If this change order is acceptable, please have all five copies executed on behalf or the City of Coppell and /~eturn three copies to our office. We are available to discuss this project further at your convenience. I Paul A. Carline, E.I.T. Enclosure ~Xsjgsjf vo12\projectst,clerical\coppell\96-149\letters~,const',co 31tra doc SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 MEMORANDUM p~r~Ljail~col~t~~ Mr. Joe Swinnea Project Ma er Landma Structures, Inc. 1665 armon Road , 6177 From: Paul A. Carline, E.I.T. Date: September 9, 1998 Subject: City of Coppell Dear Mr. Swinnea: As you are aware, there was some confusion as to what time the construction progress meeting was to be held for the Wagon Wheel Ranch Elevated Storage Tank project today. From now on, the weekly construction progress meetings will be held every Wednesday at 8:30 a.m. at the tank site until further notice. The meeting participants will include myself, yourself or your representative, Larry Davis and other members of City Staff who wish to attend. If you have any questions, please contact us. Paul A. Carline, E.I.T. Cc: Mr. Kenneth M. Griffin, P.E./ Mr. Larry Davis \\sjtXsjf ~o12\projects\clerical\coppell\96-149\letters\constXmemoldoc '- ]r SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS g333 Douglas Avenue,/~g20 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E JOE n. CARTER, P.E. September 9, 1998 GARY C. HENDR1CKS, P.E. I. C. FINKLEA, P.E. Mr. Joe Swinnea Landmark ructures, Inc. 1665 rmon Road F~ 76177 Re: City of Coppell Change Order No. 3 Dear Mr. Swinnea: We are enclosing five copies of Change Order Number 3 to your contract with the City of Coppell, for the construction of the Wagon Wheel Ranch Elevated Storage Tank. Change Order Number 3 provides for that extra work required to substitute a free span complete storage floor consisting of a concrete deck and wall mounted 1-ton jib crane in place of the partial galvanized steel storage floor and supports and ½-ton capacity free standing jib crane. If this change order is acceptable, please sign and return all five copies to this office. Sinc Paul A. Carline, E.I.T. Enclosure cc: Mr. Kenneth Griffin, P.E. Mr. Larry Davis// \Xsjfisjf vo12Xprojects\clericalNcoppell\96-149Metters\const\co 31tr doc SHIMEK, JACOBS & FINKI,EA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone (214) 361-7900 ROSS L. JACOBS, P.E. RONALD V. COIxP~VAY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTER, P.E. September 3, 1998 GARY C. HENDRICKS, P.E. I. C. FINKLEA, P.E. Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: Wagon Wheel Ranch 2.0 MG Elevated Storage Tank Bid NO. Q 0198-03 Dear Mr. Griffin: We are enclosing three (3) copies of Pay Request No. 3 in the amount of $655,310.20 for work performed by Landmark Structures, Inc., on the Wagon Wheel Ranch 2.0 MG Elevated Storage Tank project, from July 1, 1998 through August 31, 1998. This project is approximately 33% complete. The work associated with the Sandy Lake Road Water Line, added to this project by Change Order Number 1 and 2 (pay items 1-16 and 17a), is substantially complete and in service. As such, we recommend retainage for that portion of the contract be released. This pay request reflects that recommendation. If you concur with this Pay Request, please have it executed for the City of Coppell and forward one copy along with the payment due to Landmark Structures, Inc. Sincerely ~~// ~ ric Enclosures cc: Mr. Larry Davis Landmark Structures, Inc.