Loading...
Ashton Ridge-CS 961017COPPELL ENgiNEERiNG UT~L~E~ D~V~ON HEI~ORAL'DUI~ DATE: TO: FROM: RE: October 17, 1996 Larry Davis, Construction Inspector Larry Smith, Utilities Walk Thru for Ashton Ridge A walk through was conducted on 10-17-96 and the items below were found to be deficient. Brighten Lane man-hole chimney seal needs tightening Man-hole on end of Line A needs chimney seal installed.