Ashton Ridge-CS 961017COPPELL ENgiNEERiNG
UT~L~E~ D~V~ON
HEI~ORAL'DUI~
DATE:
TO:
FROM:
RE:
October 17, 1996
Larry Davis, Construction Inspector
Larry Smith, Utilities
Walk Thru for Ashton Ridge
A walk through was conducted on 10-17-96 and the items below
were found to be deficient.
Brighten Lane man-hole chimney seal needs tightening
Man-hole on end of Line A needs chimney seal installed.