Loading...
Austin Place-CS 970306To: Greg Jones, Chief Building Official From: Atul I. Patel E.I.T., Graduate Engineer RE: Austin Place - Early Releases Date: March 6, 1997 The City has received a letter from Randy Lockhart dated March 6, 1997 asking for early release of permits for model construction on Austin Place. The punch list items from the Utilities Division are being addressed. The lots for early release will require a hold on the Certificate of Occupancy until the project is final accepted. The lots being requested for early release are: lots 1, 2, & 3 Block A and lots 1, 2, 3, 6, 10 & 13, Block B. A copy of the letter requesting early release is included for your information. The lots for Austin Place have water and sewer services in place. Since the final walk thru items are being addressed, we have no objection to early releases on Lots 1, 2, & 3 Block A and lots 1,2, 3, 6, 10 & 13 Block B being granted by the Building Inspection Department. STANDARD PACIFIC HEMES March 6, 1997 Mr. Garreth Campbell Construction Inspector City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Austin Place - Early Releases Dear Mr. Campbell: As discussed, we would like the following lots released for building permits. They are: Lots 1,2,3 Block A Lots 1,2,3,6,10,13 BlockB Sincerely, Randy Lockhart RL/id 5525 MacArthur Boulevard · Suite 580 · Irving Texas · 75038 · (972) 550-0426 · (972) 550-7891 (FAX)