Loading...
Austin Place-CS 961111November 11, 1996 Terry Tice Austin Bridge and Road, Inc. DFW Paving Division 11143 Goodnight Lane Dallas, TX 75229 Re: Austin Place Addition Dear Terry: In accordance with your request, inspection service was provided by the City of Coppell Engineering Department at the referenced location on Saturday, November 9, 1996. The overtime rate including salary and benefits is $30.00 per hour. Seven hours were charged to your company on that date. Please send a check for $210.00 payable to the City of Coppell to the following address: City of Coppell Finance Department P.O. Box 478 Coppell, TX 75019 Attention: Jennifer Armstrong, Finance Director If you should have any questions, please contact me at (214) 304-3685. Construction Inspector cc: Doug Stevens, Engineering Technician Finance Department file/ovt. Itr 214 4068256 11-87-1996 ll:08AN FROI,'h-AUSTIN BRIDGE ' ROAD 2lA AOG82r'~ P. 1 Austin Bridge & Road An AuStin Industries Company ~ov~ml:~,r ?, ]e)~ Dallas, Texas 752294412 972-484-8863 972-445-5173 (Metro) 972°406-8258 (Aocountln9 Fax) Mr. Ga~,¢~ Campl~ll 972-406-8343 (Estimating Fax) c~t7 of Post Off'ice Box 478 Cop~l, Texas 75019 re: Austin Place De. ar Mr. Campbell: We ~11 bc pouring concrcte in the above referenced subdivision on Saturday, November 9, 1996 and are hereby requesting inspection. 1t' £m'thcr information is Sincerely yours, AUSTIN BRIDGE & ROAD. INC. Tr:l~k