Loading...
Asbury Estates-LR 981109 Rone Engineers. Inc. 1 't-°'~4 Goodnight Lane Tel. (972)241- 451 ~--- RoneEn 3al,as.-Fort Wcm~ Dallas, Texas Metro (972) 263-15,55 75229 Fax (972) 24i-5174 Concrete Cylinder Test Report Project Asbur¥ Estates Purchase Order Number 3137-D8076-027 I Date of Observation 10/15/98 Report Date 11/16/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 I Truck 45S I Ticket 7060072 Location PAVING ON WESTMINISTER - 120' SOUTH AND ~ 5' WEST FROM WATER HYDRANT ON EAST SIDE OF WESTMINISTER AT CUL-DE-SAC Time Sampled 3:10 Time Batched 2:05 Weather Condition CLOUDY Concrete Temperature I°F) 80 Ambient Temperature (°F) 81 Mix Number 42 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 3.3 Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 3A 7 10/22 99000 3500 4000/28 DAYS B 28 11/1 2 115000 4070 C 28 11/12 114000 4030 D H I Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39/,J Area 28.27 sq. in. I Signature: Mike Fuller, ART t~ Supervisor, CMT Remarks and/or Distribution "-. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Tony Martin, Proj. Mgr.; Newport Classic (1) Mr. Lee Stone, Comm. Bldg., Insp., Cy of Coppell LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:',wpwin\reports'.DeO76-027-ge',ST November 16, 1998