Asbury Estates-LR 981109 Rone Engineers. Inc. 1 't-°'~4 Goodnight Lane Tel. (972)241- 451 ~--- RoneEn
3al,as.-Fort Wcm~ Dallas, Texas Metro (972) 263-15,55
75229 Fax (972) 24i-5174
Concrete Cylinder Test Report
Project Asbur¥ Estates Purchase Order
Number 3137-D8076-027 I Date of Observation 10/15/98 Report Date 11/16/98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 7 I Truck 45S I Ticket 7060072
Location PAVING ON WESTMINISTER - 120' SOUTH AND ~ 5' WEST FROM WATER HYDRANT ON EAST SIDE OF
WESTMINISTER AT CUL-DE-SAC
Time Sampled 3:10 Time Batched 2:05 Weather Condition CLOUDY
Concrete Temperature I°F) 80 Ambient Temperature (°F) 81 Mix Number 42
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
ENTRAINED AIR (%) 3.3
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
3A 7 10/22 99000 3500 4000/28 DAYS
B 28 11/1 2 115000 4070
C 28 11/12 114000 4030
D H
I
Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician R. LOVELADY
ASTM C 31 I ASTM C 39/,J Area 28.27 sq. in.
I
Signature: Mike Fuller, ART t~ Supervisor, CMT
Remarks and/or Distribution "-.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Tony Martin, Proj. Mgr.; Newport Classic
(1) Mr. Lee Stone, Comm. Bldg., Insp., Cy of Coppell
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:',wpwin\reports'.DeO76-027-ge',ST November 16, 1998