Asbury Estates-LR 981109 (3) .o.e ,.c. , ooo. ,o t_ Lane )neEn ineers
D_'-, r:s ~--~....,'.,':.? Dallas. Texas .%'e.;ro. :',QTP'~.~, _, 26.3-*.. 5~,5
75229 Fa;<:~.-~ .... 241-517c
Concrete Cylinder Test Report
Project Asbury Estates Purchase Order
Number 3137-D8076-032 I Date of Observation 10/23."98 Report Date 11.;09~'98
To Western Rim Services
Contractor
Supplier LATTIMORE Plant 3 I Truck 819 ] Ticket 3072428
Location PAVING AT INTERSECTION OF JOSHUA AND CROMWELL, 20' WEST, 45' NORTH FROM WATER HYDRANT OF
JOSHUA
Time Sampled 1:15 Time Batched 12'.29 Weather Condition PT CLOUDY
Concrete Temperature (:F) 67 Ambient Temperature (°F) 63 Mix Number 42
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in,) 5.0
ENTRAINED AIR (9/o) 5.1
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
6A 7 10/30 90000 3180 4000/28 DAYS
B 28 11/20 11400 4030
C 28 11 ,'20 11100 3930*
D 56 12."18
Curing Method Test Method Standard 6" x 12" I Engineer/Technician R. LOVELADY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
I
Mike Fuller, ART Supervisor, CMT !,1¢t,[~
Signature:
Remarks and/or Distribution
*DID NOT MEET REQUIRED STRENGTH, WILL TEST HOLD CYLINDER AT 56 DAY BREAK
Distribution: (1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Tony Martin, Proj. Mgr.; Newport Classic
(1) Mr. Lee Stone, Comm. Bldg., Insp., Cy of Coppell
LIMITAT;ONS: The test resuits presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation 'n quality {composition, appearance, performance, etc.) or an,,, other feature of simdar subject matter prowded b't
persons or concbions over which ',"ce have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c: v;pwin'.reocrts'-DS076-032-98'-ST November 25, 1998