Loading...
Asbury Estates-LR 981026 Rone Engineers, Inc. 11 °-~4 Goodnight Lane Tei-(972)241-45~?-' RoneEn Da~las.-Fod Worth Dallas. Texas Me',.ro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Asbury Estates Purchase Order Number 3137-D8076-025 I Date of Observation 10/15/98 Report Date 10/26/98 To Western Rim Services Contractor Supplier LATTIMORE I Plant 7 I Truck 602 I Ticket 7060032 Location PAVING ON WESTMINISTER - 35' EAST, 30' NORTH FROM WATER HYDRANT ON EAST SIDE OF WESTMINISTER AT CUL-DE-SAC Time Sampled 11:15 Time Batched 10:41 Weather Condition CLOUDY Concrete Temperature (°F) 79 Ambient Temperature (°F) 75 Mix Number 42 Mix Description Unit Weight Water Added 5 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.0 ENTRAINED AIR (%) 3.1 Concrete Cylinder Test{s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) lA 7 10/22 107000 3780 4000/28 DAYS B 28 11/12 C 28 11/12 D H Curing Method I Test Method Standard 6" x 12" Engineer/Technician R. LOVELADY ASTM C 31 I ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, AET Supervisor, CMT I~ Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Tony Martin, Proj. Mgr.; Newport Classic (1) Mr. Lee Stone, Comm. Bldg., Insp., Cy of Coppell LIMITATIONS: The test results presented herein were prepared based upon the specific samples proweed for tesbng. We assume no responsibility for variation in quality Icomposition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:..wpwin..reports'..DS076_025.98tST October 26, 1998