Asbury Estates-LR 981026 (2) GooOnig t Lane RoneEn ineers
D<~lias. For;. "~¥C.~n i Dallas. Texas Metro (972) 263-i 555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Asbury Estates Purchase Order
Number 3137-D8076-027 Date of Observation 10/15/98 Report Date 10/26/98
To Western Rim Services
Contractor
Supplier LATTIMORE I Plant 7 I Truck 458 I Ticket 7060072
Location PAVING ON WESTMINISTER - 120' SOUTH AND 15' WEST FROM WATER HYDRANT ON EAST SIDE OF
WESTMINISTER AT CUL-DE-SAC
Time Sampled 3:10 Time Bitched 2:05 Weather Condition CLOUDY
Concrete Temperature (°F) 80 Ambient Temperature {°F) 81 Mix Number 42
Mix Description Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
ENTRAINED AIR (%) 3.3
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) {lbs.) Strength (psi) Strength Required (psi)
3A 7 10/22 99000 3500 4000/28 DAYS
B 28 11/12
C 28 11/12
D H
Signature: Mike Fuller, AET Supervisor, CMT ~
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Tony Martin, Proj. Mgr.; Newport Classic
(1) Mr. Lee Stone, Corem. Bldg., Insp., Cy of Coppell
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality Icomposition, appearance, performance, etc.) or any other feature of similar subject matter provideo b,/
persons or conditions over 'which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:'.w~win'.reports-,DSO76-027-98".ST October 26, 1998