Loading...
Asbury Estates-LR 980915Rone Engineers. Inc. 112,"--%oodnight Lane Tel. z4 -4 7 - RoneEnqineers Oal,as.'Fod Wodn Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 REPORT OF GRADATIONS OF LIME TREATED SOILS PROJECT: Ashbury Estates PAGE 1 OF 1 PROJECT NUMBER: 3137-D8076-008 REPORT DATE: September 15, 1998 CLIENT: Western Rim Services DATE OF SERVICE: September 8, 1998 SPECIFICATIONS: 100% PASSING 1 3/4" SIEVE 60% PASSING //4 SIEVE LOCATIONS: PASSING PASSING PASSING i 3/4" SIEVE 3/4" SIEVE //4 SIEVE 1. Westminister Way - 100% --- 72.7 Station 0 + 50 2. Westminister Way - 100 % --- 73.5 Station 2 + 00 3. Westminister Way - 100 % --- 77.6 Station 3 + 90 4. Westminister Way - 100 % --- 70.8 Station 0 + 75 5. Westminister Way - 100 % --- 74.8 station 2 + 30 6. o TECHNICIAN: T. Duke DISTRIBUTION: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Tony Martin, Proj. Mgr.; Newport Classic (1) Mr. Lee Stone, Comm. Bldg., Insp., Cy of Coppell LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quail .ty (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom the.',' are addressed. /t~ c:',wpwin',.reporcs\D8076-008-98\ST September 8. 1998