Loading...
Big Cedar-AG 890711Rev. 4-~4-B9 AGENDA REQUEST FORM -. CITY COUNCIL MEETING Julg 11, 1989 ITEM NO. ~C;J ITEM CAPTION: To consider a preliminary plat for the University Park Addition, located north of Bethel Road, west of Bethel School Road and south of the Hunterwood Subdivision, at the request of Joyce-Meyers Enterprises. BY STAFF REP.: Taryon Paster Bowman SUBMITTED ' (Dire%to~'~" S re) ' / ~n~ OTHER REP.:Kevin Peiffer, P'E', Gins, Inc. EVALUATION OF ITEM: DATE: July 3, 1989 Date of Planning and Zoning Meeting: June 14, 1989 Decision of Planning and Zoning Commission: Approved (3-1) Please see attached staff report for further details. BUDGET AMT.: AMT. ESTIMATED: AMT. +/- BUDGET: COMMENTS: FINANCIAL REVIEW BY: LEGAL REVIEW BY: REVIEWED BY CM: AGENDA REQ FORM - 0588DS Rev. 4~.24-8_9 SUPPORT DOCUMENTATION FOR AGEN. ITEM STAMP RECEIVED BY CITY MANAGER'S OFFICE: SUPPORT DOCL~D~NTATION SUBMITTED WIT~ AGENDA ITEM: NO. OF ORIGINALS REQUIRED / MEMOS/LETTERS/REPORTS/BILLS/MINUTES: ~ i each CONTP~CT/AGREEHENT..................' 3 originals for signature C I P CONTRACT · 6 originals for signa~ure CHANGE ORDERS ....................... : 3 originals for signature ORDINANCE ........................... : 1 blueback for signature + 3 copies CAPTION ............................. : 1 blueback for signature + 3 copie~ RESOLUTION .......................... : 2 bluebacks for signature + 1 copy PROCLAMATION ........................ : 2 bluebacks for signature + 1 copy BID ................................. : 1 each LOCATION NAPS ....................... : 12 ZONING PLANS ........................ : ./ 12 PRELIMINARY/FINAL PLATS ............. : __~ 12 SITE PLANS .......................... : 12 LANDSCAPE PLANS ..................... : 12 ARCHITECTL~AL RENDERINGS ............ : 12 DATE PUBLISHED IN THE CITIZENS'ADVOCATE: NOTIFICATION TO: DATE/METHOD OF CONTACT: _ NOTES CITY OF COPPELL PLANNING & ENGINEERING DEPARTMENT STAFF REPORT DATE: 3une 14, 1989 RE: University Park, Preliminary Plat LOCATION: North of Bethel Road, west of Bethel School Road and south of the Hunterwood Subdivision. APPLICANT: 3oyce-Myers Enterprises TRANSPORTATION: The DRC is concerned with the the plat as proposed because there is only one (1) entry access street to this subdivision. We are also concerned with the lack of visibility near the proposed Stanford Drive and Bethel School Road intersection. Fire protection for this subdivision would be provided by Fire Station No. 1, on Coppell Road. The fire trucks would have to travel along Bethel Road and then proceed north to Bethel School Road. This section of Bethel School Road is also considered as a substandard road. Because the City will need to resolve a road-widening issue versus the payment of escrow funds, the Development Review Committee offers possible options: I.) University Park developer to build Bethel School Road from Harris Street south to the intersection of Bethel Road. The developer could request a pro-rata agreement. The City must initiate condemnation of affected property. 2.) Ihe City Council may still want to entertain the idea of obtaining riGht-of-way from land owners whose property fronts along Bethel School Road, in the event that the roadway construction is not required at this time. SUMJ~RY: Applicant requests approval of a preliminary plat with the following variances: 1) LenGth of cul-de-sac; 825 feet is requested for Stanford Drive, {Comprehensive Subdivision Ordinance allows a minimum of 600 feet). 2)Alley requirement. ISm7 ALTERNATIVES: 1) Approve the preliminary plat. 2) Approve the preliminary plat with conditions as submitted. 3) Deny the preliminary plat. ATTACHMENTS: 1) Preliminary Plat 2) Map depicting a proposed re-aliqnment of Bethel School Road. UNVPARK i l?. (a} Escrows fo: Ad)acent Streets. t When o p:oposed subdivision of land abuts on both sides of an existing substanda=d :oad acco:ding to I the then existing cu::ent City of Coppell standa:ds, the Develope= shall be :equt:ed to imp=ave the I existing :oad to b:tng the same to the City of i Coppell standa:ds. Any :etmbu:sement, if due, to the Develope: by the City will be made when funds become i available. iT. (bi I If the p:oposed subdivision is located along only one side of a substanda:d :oad, and when in the City I Council's ~udgment, it is not feasible to :econst:uct I said substanda:d :oad at the time of development of said subdivision, the City Councll may pe:mit the I Develope: to pay into esc:ow an amount equal to the Develope:'s sha:e of the cost of said tmp:ovements as I a condition fo: the app:oval of the final plat of the I subdivision. The amount of esc:ow shall be as dete:mtned by a "p:o :ara" cha:ge as p:esc:tbed by I the P:o Rata O:dinance of the City and shall be payable p:io: to app:oval of plans by the City i Enginee:. I iT. Icl When funds have been p:ovided and placed in esc:ow I with the City of Coppell fo: the development of a Appendix A I ' substandard road and the road is reconstructed by others at no cost to the City, the escrowed funds and accrued interest, if any, shall be refunded to the Developer after comp]etlon and acceptance of the improvements. In the event that a portion of the cost is bo:ne by the City, the difference between the Developer's actual proportionate cost and the escrowed funds, Including accrued interest, if any, shall be refunded to the Developer after completion and acceptance of the improvements. id) Whenever under any of the provisions of this section, funds are required to be escrowed for the cost of future improvements to substandard roads, the form of such escrow shall be cash or its equivalent. ~.._~Dg~D~$~Dg DesJgD The engineering design of streets in the City of Coppe]l shall conform to the Geometric Design Standards for Tho:oughfares. Appendix A 5 Following discussion Cogenissioner Johnson moved to approve #S-1044. Commissioner Tunnell seconded the motion; motion carried (4-0) with Chairman Hunsch and Commissioners 3ohnson, Tunnell and Weaver voting in favor of the motion. Item 6: To consider approval of a zoning change, Case #ZC-520, University Park Addition, from (R & C) Retail and Commercial, to (SF-9) Single Fami!y-9, on a parcel of land located west of Bethel School Road, north of Bethel Road and south of the Hunterwood Subdivision, at the request of Joyce Myers Enterprises. Taryon Bowman introduced the item to the Commission. Ms. Bowman stated that all property owners within 200 feet of this request were notified. Three reply forms were returned in favor, and one was returned in opposition to this request. She further stated that the applicant is requesting a variance request for the length of the cul-de-sac for Stanford Drive, and a waiver for the alley requirement. Mr. Fred 3oyce of 3oyce-Meyers Enterprises, and Mr. Peter Henderson of Starnes Consulting Engineers were present to represent this item before the Commission. Chairman Munsch then opened the public hearing and asked for persons wishing to speak in opposition to the request. There were none. He then asked for persons wishing to speak in favor of the request. Those persons speaking were: Ray McDowell Representing Mrs. Ruby McDowell Mr. Tom Morton 449 Dillard Lane (Mr. Morton presented a petition from the Hunterwood Homeowners Association regarding the park and greenbelt areas directly behind their homes). The public hearing was then declared closed. Following discussion Commissioner Tunnell moved to approve Case #ZC-520. Commissioner Johnson seconded the motion; motion carried (4-0), with Chairman Munsch and Commissioners Johnson, Tunnell and Weaver voting in favor of the motion. PLATTING Item 7: To consider approval of a preliminary plat for the University Park Addition, located west of Bethel School Road, north of Bethel Road and south of the Hunterwood Subdivision, at the request of Joyce Myers Enterprises. Taryon Bowman introduced the item to the Commission. She stated the Development Review Committee is concerned due to the fact that there is only one entry access street to the subdivision, as well as the lack of visibility near the proposed Stanford : DRAFT Drive and Bethel School Road intersection. Ms. Bowman stated that fire protection for this subdivision would be provided by Central Fire Station on Coppell Road. The fire trucks would have to travel along Bethel Road, and then proceed north to Bethel School Road. She further stated that this section of Bethel School Road is considered as a sub-standard road. Ms. Bowman then stated that the City will have to resolve a road widening issue. She then stated that the Development Review Committee feels that Bethel School Road, adjacent to University Park, should be built at this time. Staff recommends that should the Planning and Zoning Commission recommend approval of this preliminary plat to the City Council, that Bethel School Road be built at this time. Mr. Fred Joyce of Joyce-Meyers Enterprises was present to represent this item before the Commission. Following discussion Commissioner Weaver moved to approve the preliminary plat for the University Park Addition. Commissioner Johnson seconded the motion; motion carried (3-1), with Chairman Munsch and Commissioners Johnson and Weaver voting in favor of the request, and Commissioner Tunnell voting against the motion. Item 8: To consider approval of a final plat for the Shadow Woods Addition, located approximately 182 feet south of the southwest corner of Sandy Lake Road and Coppell Road, at the request of Centex Real Estate Corporation. Taryon Bowman introduced the item to the Commission. Ms. Bowman stated that the applicant is request approval of a final plat, as well as variances. Kevin Peiffer of Giun, Inc. stated that they had just received the floodplain study for the area along the creek lots, and that they had not had time to completely evaluate the study. He further stated that they would recommend that approval of this final plat be with the condition that the floodplain issues be resolved before going on to Council. Mr. Peiffer also stated they are also working on the technical conditions of the construction plans. Mr. Nathan Maier of Nathan Maier Engineers was present to represent this item before the Commission. Following discussion Commissioner Tunnell moved to approve the final plat for Shadow Woods Estates with the condition that Staff has an opportunity to review and approve the flood study of the floodplain and drainage and construction plans prior to the final plat going to the City Council. Commissioner Johnson seconded the motion; motion carried (4-0) with Chairman Munsch and Commissioners Johnson, Tunnell and Weaver voting in favor of the motion. June 13, 1989 Joe Hunsch, Chairman Planning and Zoning Commissioners Planning and Zoning Co~ssion 255 Parkway Boulevard Coppell, TX 75019 Dear Chairman Hunsch and Conmissioners: We, the residents of the City of Coppell, and homeowners in the Runterwood Sub-Division, are in support of the Planning and Zoning Co~mtssion accepting the dedication of the park and greenbelt area, located south of Dillard Lane and north of Bethel Road, into the City. However, the residents smst closely affected, whose si~natures appear on the attached petition, request that the City leave the park and greenbelt area in its natural state. If any changes or alterations are made we request they be umde in consultation with, and approved by, the residents of the ~unterwood Sub-Division. Should the Planning and Zoning Commission accept this dedication and approve the zoning change, Case ~ZC-520, we would further request the Planning and Zoning Commission to include our request in the official motion for approval. Thank you for your ti~e and cooperation. Respectfully submitted, Howard H. Grau, President Hunterwood Homeowners Association Hunterwood Sub-Division cc: Hayor and City Council City Hanager, Alan D. Ratliff City Engineer, Russell Doyle Planning and Zoning Coordinator, Taryon Bowman STATE OF TEXAS COUNTY OF DALLAS CITY OF COPPELL