Loading...
Asbury Manor-CS 971006 Coppell, Texas 75019 ~~ The City With A Beautiful Future 214-462-0022 October 6, 1997 Fred Phillips Ryland Homes 12000 Ford Road, Suite 320 Dallas, TX 75234 RE: Asbury Manor Development Fee Assessment Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $142,090.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Q KEnneth M. Grif m, P.E. Assistant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisttre Services DEVELOPMENT FEE TABLE Project: Asbury Manor Date: 10/6/97 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $22,950.00 $22,950.00 (100% due prior to Council Approval) Water Tap Inspection Fee $2,350.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,110.44 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $144.38 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,380.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $20,700.00 $20,700.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $2,300.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $2,300.00 (100% due at Issuance of Building Permi0 Park Fee $59,110.00 $59,110.00 (100% due prior to Council Approval) Roadway Impact Fee $39,330.00 $39,330.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $151,709.82 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $142,090.00 b~VELOPMENT FEE WORKSHEET PROJECT: Asbury Manor DATE: 10/6/97 Water Impact Fee: Domestic Meter(s): 46 - 5/8 inch X 3/4 inch 46 ESU's Irrigation Meter(s): I - I 1/2 inch 5 ESU's ESU's Fireline Meter(s): ESU's Total #: 51 ESU's @ $450.00 ea. $22,950.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 47 Connections @ $50.00 ea. $2,350.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 46 Domestic Meter(s) @ $24.14 $1,110.44 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total #: I Irrigation Meter(s) @ $144.38 $144.38 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total #: 46 Meter(s) @ $30.00 ea. $1,380.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Meter(s) @ $35.00 ea. $35.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 46 @ $450.00 ea. $20,700.00 Wastewater Tap Inspection Fee: Total #: 46 Connections @ $50.00 ea. $2,300.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 46 Lots @ $50.00 ea. $2,300.00 (100% due prior to issuance of building permit) Page I ,. EVELOPMENT FEE WORKSH=ET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: 46 Single-family @ $1285.00 / Lot $59,110.00 N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $39,330.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROA~ WAY IMPACT FEE CALCUL~ £IONS PROJECT: Asbury Manor DATE: 10/6/97 ROADWAY IMPACT FEE: Service Area * 1 Category ** Residential Land Use ** Single-Family Detached Building Size (Sq. Ft.) N/A Development Units ** 46 Vehicle Miles per Development Unit ** 2.85 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee Per Vehicle Mile) = $39,330.00 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study)