Big Cedar-LR 920731reed engineering GEOTECHNICAL CONSULTANTS July 31, 1992 Project No. 824.1 Report No. 8 Matthews Investments Southwest, Inc. 5220 Spring Valley Road, Suite 500 Dallas, Texas 75240 ATTN: Mr. Tim House Re: Construction Materials Testing Big Cedar Addition Harris Road Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses the activities of July 8 and 10, 1992. On the referenced dates, 3 field density tests were taken on the fill placed on the east side of Lot No. 7. Test results are shown on Plate 1. Where tested, the materials were found to be in compliance with project specifications, except as noted. Where materials were not in compliance, the soils were reworked and retested. Test failures and retests are noted in lower and upper case letters, respectively. If any questions arise, do not hesitate to call. Sincerely, ~~ 'THE REED EN~OUP Ronald F. Reed, P.E. MDS/RFR/wde copies submitted: (2) Matthews Investments Southwest, Inc./ Mr. Tim House (1) Goodwin & Marshall, Inc./Mr. Robert Marshall ~1) City of Coppell/Mr. Larry Davis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 reed engineering BIG CEDAR ADDITION HARRIS ROAD COPPELLt TEXAS REPORT NO. 8 Date 07-08-92 07-10-92 Test No. 81 82 83 Field Density Tests Lot No. Depth Com- Below Unit pac- Final Dry Moisture tion S.G. Weight Content Curve Level (feet) (DCf) {%) No. (%) 7(1) 0.0 90.6 14.3 3 82.1a 7(2) 0.0 105.2 20.6 3 95.4 7(1) 0.0 105.8 16.4 3 95.9A Footnotes: (1) Test performed at SE corner of building pad. (2) Test performed at NE corner of building pad. P1 ate 1 GEOTECHNICAL CONSULTANTS