Big Cedar-LR 920730reed engineering GEOTECHNICAL CONSULTANT~ June 30, 1992 Project No. 824.1 Report No. 7 Matthews Investments Southwest, Inc. 5220 Spring Valley Road, suite 500 Dallas, Texas 75240 ATTN: Mr. Tim House Re: Construction Materials Testing Big Cedar Addition Harris Road Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report -addresses activities for the period of May 13 through June 30, 1992. During the above period, 13 field density tests were taken on the fill placed in the slope area between Lots 4 and 5 and on fill placed in the residential building pads of Lots 7, 8, 9, and 10. Where tested, the materials were found to be in compliance with project specifications, except as noted. Where materials were not in compliance, the soils were reworked and retested. Test failures and retests are noted in lower and upper case letters, respectively. If any questions arise, do not hesitate to call. Sincerely, Ronald F. Reed, P.E. MDS/RFR/wde copies submitted: (2) Matthews Investments Southwest, Inc./ Mr. Tim House (1) Goodwin & Marshall, Inc./Mr. Robert Marshall ~1) city of Coppell/Mr. Larry Davis 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-0019 reed engineering BIG CEDAR ADDITION HARRIS ROAD COPPELLv TEXAS REPORT NO. 7 Date 05-13-92 05-14-92 06-23-92 06-30-92 Test No. 68 69 70 71 72 73 74 75 76 77 78 79 80 Field Density Tests Lot No, Depth Below Unit Final Dry S.G. Weight (feet) (Dcf) 4 & 5 4 & 5 4 & 5 4 & 5 4 & 5 4 & 5 4 & 5 4 & 5 8 9 10 7 8 9.0 107.5 8.0 107.6 8.0 110.0 7.0 101.1 7.0 108.7 7.0 108.9 6.0 112.6 6.0 112.2 0.0 110.3 0.0 109.7 0.0 106.5 1.0 115.2 1.0 114.4 Com- pac- Moisture tion Content Curve Level (%) No. (%) 15.2 3 97.5 14.8 3 97.6 14.6 3 99.7 22.0 3 91.7a' 15.7 3 98.5A 17.1 3 98.7 15.9 1/3 98.2 14.8 1/3 97.8 16.5 3 100.0 16.7 3 99.5 18.3 3 99.6 13.3 1 96.7 13.7 2 97.2 P1 ate 1 GEOTECHNICAL CONSULTANTS