Loading...
Big Cedar-LR 920603REPORT NO.: e P~E~:Big Cedar Addition L~A~oN:Brock St. STA 5+75 reed engineering GEUi ,-CHNICAL CONSULTAh m ~ CONCRETE COMPRESSION TEST REPORT joR NoB 2 4.1 DATE C~S~:06/03/92 ~C,~:4 0 0 0 PS I 27/200 QUANTITY REPRESENTED: ARCH~ECT~NG~NEER~oodwin & Marshall, Inc. ~ToR:Paveway Construction 07/01/92 RE~mTED~:Matthews Investments Southwest $AM~EDBY:H. Johnson sYoR~RoF:Contractor ORDER NUMSER: (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA-2~.26 ~Q. IN. FIELD NUMBER: MAXIMUM LOAD, LBS: AGE WHEN TESTED, DAYS: cOMPRESSIVE STRENGTH, PSh AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) LABORATORY NUMBER BCA060301 BCA060302 95,000 122,000 7 28 3360 4310 R~AR~S: Does comply with Specification BCA060303 123,500 28 4370 4340 METHOD OF CURING: FIELD 1 DAYE, LABORATORY FROM TEMPERATURE: AMBIENT 7 9 °F M~X 8 3 °F, TIME OF ~AMPLE: l i: 15 06/04/92 TRANSPORTED BY Reed AIR CONTENT 4 · 2 0 R%, SLUMP PICK-UP CHARGE: 4 · 5 INGHEB ~s ~o BOULE OF CONC.ETE: M i d- C i t i e s FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): MIX CODE: 5 TICKET NO.: 259567 UNIT WEIGHT PCF YIELD CF/CY (f~TR~6'~Nd & Marshall, Inc./Mr. Robert Marshall Paveway Construction/Mr. John Owens city of Coppell/Mr. Larry Davis ~GNED TEST METHCOS: ASTM C 31, C39, C 143, C 173, C 192, C 231, ORC ~0~4 PAGE 2424STUT~DRIYE · SUITE400 · DALL~,TEX.~75235 · 214/350-5600 · (FAX) 214/3S0-O01~ _ OF 2 reed engineering 'CONCRETE COMPRESSION TEST REPORT REPORT NO.: 8 PROJECT: Big Cedar Addition Brock St. - STA 3+25 ARCHfTECT~NGINEER: Goodwin & Marshall, Inc. ~m~oR: Paveway Construction ~e NO.: 824 - 1 GEOTECHNICAL CONSULTANTS RAmm ~: 06/03/92 ~~: 4000 PSI 135/200 QUANTITY REPRESENTED: 8AMPI. ED aY: H · Johnson 'B* OR~R ~: Contractor 07/01/92 REeoRTEDTO: Matthews Investments SouthwestRATE: 06/10/92 OROERNUMBER: (6 x 12 INCH) NOMINAL CYLINDER SIZE: AREA.28.26 8(3. IN. FIELD NUMBER: MAXIMUM LOAD, LB~: AGE WHEN TESTED, DAYS: COMPRESSIVE STRENGTH. F~I: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: LABORATORY NUMBER BCA060304 BCA060305 65,000 115,000 7 28 2300 4070 Does comply with Specification BCA060306 116,500 28 4120 4100 METHOD OF CURING: FIELD i DAYS. LABORATORY FROM TEMPERATURE: AMBIENT 81 'F M,X 89.F, 03:10 X TIME OF SAMPLE: AM/FId, 06/04/92 Tn~B.ORTEDB¥ Reed aJn CONTENT 4 · 40 ~. SLUMP PICK-UP CHARGE: 5. 25 INCHES ~OURCE C~ CONCRetE: Mid-Cities FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): MIX CODE: 5 TICKET .0.: 259578 UNr[ WEK~HT ~ELD PCF CF/CY (~R'~9~:dwin & Marshall, Inc./Mr. Robert Marshall ~~ Paveway Construction/Mr. John Owens city of Coppell/Mr. Larry Davis ~IGNED 2 TEST METHODB: ASTId C 31. C 39. C 143, C t73, C 192, C 231, OR C 1064 PAOF OF 24248TUI~DRIYE · SUITE400 · DALLY, TEXt75235 · 214/3~-5000 · (FAX) 214/350-0019 2 reed engineering GEOTECHNICAL CONSULTAI~I I~S CONCRETE COMPRESSION TEST REPORT REPORT NO.: 8 PROJECT: Big Cedar Addition L~A~NBrOck St. STA 5+75 jGG NO824 · 1 DATE CAST:06/03/92 8PECiF~AT~3N:4000 PS I RE~E~N~D:27/200 ARCH~ECTrENGINEER~oodwin & Marshall, Inc. ~CTOR: Paveway Construction RE~TEO To:Matthews Investments Southwest D^~O 6/10/92 SAMPLED BY:H · Johnson BY O,~:~R OF:Contractor ORDER NUMBER: (6 x 12 IHCH) NOMIHAL CYLINDER SIZE: AREA-28.26 SQ. IN. FIELD NUMBER: MAXIMUM LOAD, LBS: AGE WHEN TESTED, DAYS: COMPRESSIVE STRENGTH. PSh AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: lABORATORY NUMBER BCA060301 BCA060302 BCA060303 95,000 7 28 28 3360 METHOD OF CURING: FIELD TEMPERATURE: AMBIENT TIME OF SAMPLE:11 15 : 1 DAYS, LABORATORY FROM 06/04/92 TRANSPORTED BY Reed 79 'F M~X 83 'F, A~R CONTENT 4 · 20 ',,, 8LUMP JU~PM, P~CK-UP CHARGE: MIX CODE: 5 TICKET NO.: 259567 UNIT WEIGHT YIELD SOURGE OF CONCRETE:Mid_Cities. FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): 4.5 INCHES .YES ~0 PCF CF/CY City of ~a~news lnves~ments ~ou~nwest, Inc./Mr. '1'~ Hou~ __ ~ & Marshall, Inc./Mr. Robert Marshall // /j~/~ ~ j Construction/Mr. John Owens /~Y--'~F~~. Coppell/Mr. Larry Davis ' ~---~' - ' ' ~NED TE~METHODS: AB~ C31, C~, C1~, C173, C192, C~I, ORCl~ PAGF 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · 2 (FAX) 214/350-0019 REPORT ~.: 8 P~OJE~: Big Cedar Addition Brock St. - STA 3+25 L~AT~N: reed engineering CONCRETE COMPRESSION TEST REPORT ~NO.: 824.1 ~CH~CT~,G,NEER: Goodwin & Marshall, Inc. CONTRACTOr: Paveway Construction GEOTECHNICAL CON SU LTANT~ ~TE ~: 06/03/92 ~c,~: 4000 PS I 135/200 QUANTITY REPRESENTED: S~.ED sY: H. Johnson 'SYmR~: contractor RE~DTO: Matthews Investments SouthwestDATE: 06/10/92 ~RHUM~R: (6 x 12 INCH) NOMINAL CYLINDER 81ZE: AREA-28,26 ~Q. IN. FIELD NUMBER: MAXIMUM LOAD, LBS: AGE WHEN TESTED, DAYS: COMPRESSIVE STRENGTH, PSI: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: LABORATORY NUMBER BCA060304 BCA060305 BCA060306 65,000 7 28 28 2300 METHOD OF CURING: FIELD 1 DAYS, LABORATORY FROM 06/04/92 TRANSPORTED BY Reed TEMPERATURE: AMBIENT 8 1 *F T~E OF EAM~.E: 03: 10 A~. M~X 8 ~F. A~ ~TENT 4 · 40 ~. ~uuP PICK-UP CHARGE: 5.25 INCHES Y~ ~ SOURCE OF CONCRETE: Mid-cities RNE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(8): MIX CODE: TICKET NO.: 5 259578 UNIT WEIGHT PCF YIELD CF/CY R, (2) Muthews investments ~outnwest, inc./Mr._ ..~/~--~%Tim Mouse (~ ~}~8:dwin & Marshall, Inc./Mr. Robert Marshall (1) Paveway Construction/Mr. John Owens (1) City of Coppell/Mr. Larry Davis ~IGNED 2 TEST METHODS: ASTM C 31, C 39, C 143, C 173, C 192, C 23% OR C 1064 PAGF OF 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · (FAX) 214/350-O019