Loading...
Big Cedar-LR 920527REPORT NO.: 7 .ROJECT: Big Cedar Addition Brock Street STA 5+00 LOCATION: reed engineering GEO~ECHNICAL CONSULTAN i~., CONCRETE COMPRESSION TEST REPORT ~a .O.: 8 2 4 · 1 ~TE c~: 05/27/92 ~PE~F~.A~ON: 3000 PSI ~RE~ESE~0:45/100 yds ARCHITECT/ENGINEER: Goodwin & Marshall, Inc. a~,et. EOBY: B. Steadman CONTRACTOR: Paveway Construction aY OR~R ~: contractor RE~mTEDTO: Matthews Investments Southwes~TE: 06/03/92 OR~m.UMBER: (6 x 12 INCH) NOMINAL CYUNDER SIZE: AREA-2~.2680. IN. FIELD NUMBER: MAXIMUM LOAD. LBS: AGE WHEN TESTED, DAYS: COMPRESSIVE STRENGTH. PSI: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N,O,) REMARKS: LABORATORY NUMBER BC052701 BC052702 BC052703 110,000 7 28 28 3890 METHOD OF CURING: RELD TEMPERATURE: AMBIENT 10:45 TIME OF SAMPLE: 1 DAYS, LABORATORY FROM 05/28/92 TRANSPORTEOBY Reed 66.F MIX 7 2F, AIR OONTENT 4 · 104. BLUMP AM~, PICK-UP CHARGE: 5INCHES NO- ~OURCE OF CONCRETE: Mid-Cities Ready Mix M,x CODE: 5 SK FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): TICKET NO.: 258965 UNIT WEIGHT YIELD PCF CF/CY o /p ~y'e~'~6dwin (1) Paveway Construction/Mr. Jo ,,,~m.er"/~ '~L1) city of Coppell/Mr. Larry Davis 81GNED TEST METHODS: ASTM C al, C 39, C 143, C 173, C 192, C 231, OR C 1064 PAGE 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 2141350-5600 · (FAX)214/350-OO1u REPORT NO.: '7 ,~ECT.. Big Cedar Addition Brock Street STA 5+00 LOCATION: reed engineering GEUI*'CHNICAL CONSULTANTS CONCRETE COMPRESSION TEST REPORT JoB NO.: 8 2 4.1 ARCHITECT~NGINEER: Goodwin & Marshall, Inc. ~CTOR: Paveway Construction DAm ~: 05/27/92 SPEOIF~ATK)N: 3000 PSI OUANTII'~ REPRESENTED: 45/100 yds ~ED aY: B. Steadman BY ORDER OF: Contractor 06/24/92 RE~OR~DTO: Matthews Investments SouthweStDA~: 06/03/92 ORO~RNO~SER: (6 x 12 INCH) NOMINAL CYLINDER 81ZE: AREA-28.26 SQ. IN. FIELD NUMBER: MAXIMUM LOAD, LBS: AGE WHr~N TESTED, DAYS: COMPRESSIVE STRENGTH. PSI: AVERAGE STRENGTH, PSI: TYPE BREAK: CONICAL (U.N.O.) REMARKS: LABORATORY NUMBER BC052701 BC052702 110,000 148,000 7 28 3890 5230 Does comply with Specification BC052703 150,000 28 5310 5270 METHOD OF CURING: FIELD I DAYS, LABORATORY FROM TEMPERATURE: AMSIENT 6 6 *F MIX 7 2°F, TIME OF SAMPLE: 10: 4 5 05/28/92 TRANSPORTED BY AIR CONTENT 4 · 10 ~. SOURCE OF CONCRETE: Mid-Cities Ready Mix MIXCODE: 5 SK FINE AGGREGATE: COARSE AGGREGATE: WATER: CEMENT: FLY ASH: ADMIXTURE(S): Reed 8LUMP PIGK-UP CHARGE: TICKET NO.: 2 5 8 9 6 5 UNIT WEIGHT YIELD 5 INCHES PCF CF/CY ~TR, T , ( Z ) macbews ±nvescments southwest, Inc./Mr. 'J.~,.t~ House.. (~ ~:dwin & Marshall., Inc./Mr. Robert Marshall .~(111 Paveway Construction/Mr. John,Owens city of Coppell/Mr. Larry Davis 1 TEST METHODS: ASTM C 31, C 39, C 143, C 173, C 192, C23t, CRC 1064 PAG~ OF 2424 STUTZ DRIVE · SUITE400 · DALLAS, TEXAS75235 · 214/350~5600 · (FAX) 214/35(~0019