Big Cedar-LR 920520reed engineering GEOTECHNICAL CONSULTANTS May 20, 1992 Project No. 824.1 Report No. 6 Matthews Investments Southwest, Inc. 5220 Spring Valley Road, Suite 500 Dallas, Texas 75240 ATTN: Mr. Tim House Re: Construction Materials Testing Big Cedar Addition Harris Road Coppell, Texas Gentlemen: Submitted here are the results of testing and observation of construction materials at the referenced project. This report addresses activities for the period of April 1 through May 8, 1992. On April 1 and 9, 1992, nine field density tests were taken on the fill placed in Sanitary Sewer Line A. Test results are shown on Plate 1. Where tested, compaction levels ranged from 95.4 to 98.7 percent with moisture contents at 0.3 percentage points below optimum to 3.0 percentage points above optimum. On April 23 and 24, 1992, gradations were performed on the cement- treated subgrade in the proposed streets. Results are summarized on Plate 2. Where tested, materials were found to be in excess of the required 75 percent passing a 3/4-inch sieve. In addition, eight field density tests were taken on the compacted cement-treated subgrade. Results are shown on Plate 3. Where tested, compaction levels ranged from 97.5 to 101.3 percent, with moisture contents from 0.7 to 2.9 percentage points above optimum. Two samples of the cement-treated subgrade were obtained for development of optimum moisture-density relationships (Standard Proctor Curves). Test results are attached as Plates 4 and 5. On May 5 through 8, 1992, concrete placement began on Leigh Street and Lynn Court. Compressive strength test results will be submitted under separate cover. 2424 STUTZ DRIVE ' SUITE400 · DALLAS, TEXAS75235 · 214/350-5600 · {FAX) 214/350-0019 Matthews Investments Southwest, Inc. Project No. 824.1/Report No. 6 May 20, 1992 Page 2 If any questions arise, do not hesitate to call. Sincerely, E~~ROUP Ronald F. Reed, P.E. MDS/RFR/aap copies submitted: (2) Matthews Investments Southwest, Inc./ Mr. Tim House (1) Goodwin & Marshall, Inc./Mr. Robert Marshall ~ city of Coppell/Mr. Larry Davis reed engineering BIG CEDAR ADDITION HARRIS ROAD COPPELLv TEXAS REPORT NO. 6 Date 04-01-92 04-09-92 Test No. 51 52 53 54 55 56 57 58 59 Field Density Tests on utility, Trench Backfill Depth Below Unit Final Dry Line No./ S.G. Weight STA No. (feet) (Dcf) Moisture Content (%) Com- pac- tion Curve Level No. (%) A/ll+50 8.0 108.9 A/11+52 4.0 107.0 A/11+55 0.0 107.2 A/ 8+20 8.0 105.2 A/ 8+25 4.0 107.7 A/Lateral at Lot 41 2.0 106.1 A/Lateral at Lot 41 4.0 107.9 A/Lateral at Lot 37 2.0 105.2 A/Lateral at Lot 37 4.0 107.0 17.2 3 98.7 19.3 3 97.0 18.0 3 97.2 18.4 3 95.4 17.9 3 97.6 16.8 3 96.2 16.0 3 97.8 17.4 3 95.4 17.0 3 97.0 Plate 1 GEOTECHNICAL CONSULTANTS · reed engineering .. BIG CEDAR ADDITION HARRIS ROAD COPPELLv TEXAS REPORT NO. 6 Date 04-23-92 04-24-92 Gradation Test Results Location Leigh Street/STA 1+20 Brock Street/STA 6+50 Brock Street/STA 2+25 Lynn Street /STA 1+50 % Passinq 3/4" siev~ 85 84 77 82 Plate 2 GEOTECHNICAL CONSULTANTS reed engineering BIG CEDAR ADDITION HARRIS ROAD COPPELL, TENA8 REPORT NO. 6 Dat9 04-23-92 Test No. 60 61 62 63 64 65 66 67 Field Density Tests on Cement Treated 8ubqrade Unit Dry Street Weight Name station (Dcf) Leigh St. 3+30/CL 113.4 Leigh St. l+29/LCL 115.1 Brock St. 8+12/CL 113.8 Brock St. 5+65/RCL 113.8 Brock St. 2+00/RCL 110.9 Brock St. 4+50/LCL 110.5 Lynn Crt. i+O0/RCL 112.6 Lynn Crt. 2+80/CL 110.8 Moisture Content Curve No. 15.4 5 14.0 5 16.7 6 14.9 6 16.8 6 15.7 6 13.5 5 14.2 5 Com- pac- tion Level ¢%) 98.8 101.3 100.9 100.9 98.3 98.0 99.1 97.5 Plate 3 GEOTECHNICAL CONSULTANTS -- REED ENGINNERING GROUP --~' 114 112 110 108 106 8 10 12 14 16~ 18 Moisture Content (%) Standard Proctor 25 and 12 inch drop using Test performed on minus Boring No. -- Location Big Cedar Addition, Compaction Test No. 5 __ blows per each of 3 layers, with 5.5 pound hammer 4 inch diameter mold #4 Sieve size material Coppel 1, Texas Depth - Sample No._ Classification Cement treated reddish-brown clay Liquid Limit °/o Plastic Limit O/o Plasticity Index Maximum Unit Dry Weight 113.6 Optimum Moisture Content 12.9 OPTIMUM MOISTURE DENSITY CURVE Plate 4 GEOTECHNICAL CONSULTANTS -- REED ENGINNERING GROUP 114 112 110 108 106 104 10 12 14 16 18 20 Moisture Content (%) Standard Proctor Compaction Test No. 6 25 blows per each of 3 layers, with 5.5 pound hammer and 12 inch drop using 4 inch diameter mold Test performed on minus//4 Sieve size material Boring No.- Location Big Cedar Addition~ Coppell~ Texas Depth - Sample No._ Classification Cement treated brown clay Liquid Limit o/o Maximum Unit Plastic Limit o/o Dry Weight 112.8 Plasticity Index Optimum Moisture Content 14.3 OPTIMUM MOISTURE DENSITY CURVE P1 ate 5 GEOTECHNICAL CONSULTANTS