Loading...
WA9601-CS 980415SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361~0204 Phone (214) 361-7900 MEMORANDUM To: Mr. Kenneth M. Griffin, P.E. City of Coppell Post Office Box 478 Coppell, Texas 75019 From: Gary C. Hendricks, P.E. , -" Date: April 15, 1998 Subject: Sandy Lake Road Water Line Forest Cove Phase I & II Ken: After the Pre-construction conference for the Wagon Wheel Ranch Elevated Storage Tank Project, we discussed the possibility of adding the construction of the Sandy Lake Road Water Line along the frontage of the Forest Cove Additions to the elevated storage tank project by change order. This would be done in order to expedite the water line construction and coordinate construction efforts with the adjacent development. We have outlined the scope of work required to construct this segment of the water line and provided preliminary information to Gifford Hill American Pipe Co., in order to obtain their best guess at the pipeline production schedule. Once GHA has a~f purchase order, it will take approximately one week to complete the production drawings for our review. Our review of the production drawings for conformante with the plans and specifications should take no more than 2 days. Once approved drawings are in GHA hands, pipe production and delivery to the job site should take about 5 weeks. If our contractor has equipment on site and has completed the necessary bores in advance of the pipe delivery, it should take no more than three weeks to complete the construction of the water line and appurtenances. We are currently working to prepare the necessary revisions to the construction plans and the change order documents and should be ready by the end of this week to forward to Landmark Structures, Inc. for the change order request. At that time, we will also provide you with our opinion of probable construction cost j:\coppell~96-149\lettersxconstXco_mem.doc Page No. 1 of 2 for this segment of work and the additional engineering and administration fees expected. If Landmark responds favorably, we should have an executed change order in hand by the end of next week ( April 241h). Ken, using these document preparation, pipe production, delivery and construction times, you could expect the water line construction along the frontage of the Forest Cove Additions to proceed as follows: Date/Schedule Description April 24 -May 1 Prepare and Execute Change Order May 1 -May 7 Prepare Shop Drawings May 7 -June 11 Pipe Production and Delivery June 1 - July 1 Construction of Water Line In addition to discussing this change order with Landmark Structures, Inc., we also recommend discussing construction of this segment of the water line with the utility contractor currently on site at the Forest Cove Addition. Of course, this contractor would have to work as a subcontractor to Landmark. Page No. 2 of 2