Loading...
Blooming Colors-CS 940713COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: July 13, 1994 Larry Davis, Construction Inspector~ll~ Rey Gonzales, Streets Superintenden~ Blooming Colors Walk Through July 13, 1994 The following items were noted during our walk through at the above referenced location this morning. Please make sure that the contractor is provided with a copy of the punch list items. * Pavers on east side have a large concrete chip out that has been filled with crack sealer - needs corrected. * Hairline crack has formed from this chip to the curb. * Sidewalk on both sides of driveway missing fiberboard. * Drop inlet at west side of drive approach doesn't have fiberboard either. * Between water meter and sidewalk area needs backfilled. If you have any questions please contact Public Works. /rg cc: Central File BLOOMWT.RG