July 13, 1994
Larry Davis, Construction Inspector~ll~
Rey Gonzales, Streets Superintenden~
Blooming Colors Walk Through
July 13, 1994
The following items were noted during our walk through at the
above referenced location this morning. Please make sure that
the contractor is provided with a copy of the punch list items.
* Pavers on east side have a large concrete chip out that
has been filled with crack sealer - needs corrected.
* Hairline crack has formed from this chip to the curb.
* Sidewalk on both sides of driveway missing fiberboard.
* Drop inlet at west side of drive approach doesn't have
fiberboard either.
* Between water meter and sidewalk area needs backfilled.
If you have any questions please contact Public Works.
/rg
cc: Central File
BLOOMWT.RG