Big Cedar-LR 920403SOUTHWESTERN LABORATORIES
Materials, environmental and geotechnical engineering, nondestructive, metallurgical and analytical services
2575 LONE STAR DRIVE * P.O. 80X 22&227, DALLASwTEXAS 75222 * 214/631-2700
CLient
LEGEND CONSTUCTION
P.O. BOX 606
EULESSw TX. 76039-0606
_ By: Engineering
CLient No. 2774100
Report No. D2-04-021
Report Date 04/03/92 15:52
Attn: FLOYD KEY
Project CITY COPPELL/BIG CEDAR ADDTN
PROJECT - BIG CEDAR/8" MAIN
Date SampLed 04/02/92
Sampte Type WATER
P.O. #
SampLed By DAVID/LEGEND
Transported by FLOYO KEY
Date Received 04/02/92
Lab No.
D2-04-021-01
D2-04-021-02
D2-04-021-03
D2-0~-021-04
Revieuedy '
SampLe Identification
BROCK STREET/LOT #1
LYNN COURT
LEIGH STREET
BROCK STREET/LOT #9
SOUTHUESTERN LABORATORIES
Bob Garrett, Mgr., EAS
SOUTHWESTERN LABORATO~IES
Order # D2-04-021
0~/03/92 15:52
CLient-- LEGEND CONSTUCT]ON
Page 2
TEST RESULTS BY SAMPLE
SampLe: 0lA BROCK STREET/LOT #1
ColLected: 04/02/92 11:30
Test Name
Total CoLiform
SampLe: O~A LYNN COURT
Method
909A
ResuLt Units
0 COL./lO0
CoLLected: 04/02/92 11:30
Detection Date
Limit Started AnaLyst
0 04/03/9Z NW
Test Name
Total CoLiform
Method
909A
ResuLt Units
0 COL./lO0
Detection Date
Limit Started
AnaLyst
0 04/03/92 NW
SampLe: 03A LEZGH STREET
CoLlected: 0~/02/92
Test Name
Total CoLiform
Method
909A
ResuLt Units
0 COL./lO0
Detection Date
Limit Started AnaLyst
0 04/0~/92 N~
Sampte: O~A BROCK STREET/LOT
CoLLected: 0~/02/92 11:~0
Test Name
Total CoLiform
Method
909A
ResuLt Units
0 COL./lO0
~etection Date
Limit Started AnaLyst
0 04/03/92 N~